Overview
Broadneck Penninsula Trail is a planned, paved 10’ wide asphalt trail generally located within the right of way of College Parkway in Arnold with a mainline length of approximately 8 miles. When complete, the trail will ultimately connect the B&A Trail to Sandy Point State Park with multiple spurs and connections to keys points of interest along the College Parkway corridor and the surrounding area.
In addition to the local transportation and recreation benefits of this project, Broadneck Trail also ties to routes of national significance. The connection of the Broadneck Trail to the B&A Trail provides important links to and will eventually serve as part of the American Discovery Trail, an east coast to west coast national trail system extending from Cape Henlopen, Delaware to Point Reyes, California and the East Coast Greenway, another national route extending north to south from Maine to Florida.
Broadneck Peninsula Trail is open dawn to dusk
Active Projects
The design and construction of this project is phased. Click on the pull down menu to find more details for each phase.
Location
- Green Holly Drive to East College Parkway at Peregory Park Place (0.87 miles)
- Spurs: Cape St. Claire to Walnut Ridge (0.19 miles), Broadneck Library, Broadneck Park
For safety: No trespassing in construction zones is permitted
Location
- East College Parkway at Peregory Park Place to Log Inn Road (1.8 miles)
- Spur: Bay Head Park (0.22 miles)
Project Description
- Phase 1B will extend from existing Phase IA terminus and connect to Bay Head Park
- Phase IB and Phase V are being constructed concurrently and will be constructed in segments.
Schedule
- See Department of Public Works - Broadneck Trail Phase 1B - Peregoy Park Place to Revel Downs Drive for schedule.
- See Department of Public Works - Broadneck Trail Phase 1B - Revel Downs Drive to Bayhead Road for schedule.
- See Department of Public Works - Broadneck Trail Phase 1B - Bayhead Road to Yorktown Road for schedule.
- See Department of Public Works - Broadneck Trail Phase 1B - Yorktown Road to Log Inn Road for schedule.
Project Status
- Peregoy Park Place to Yorktown Road: Final details and signage in process
- Yorktown Road to Log Inn Road: Paving, final details and signage in process
- Bay Head Park Spur: Not yet initiated
- Flagman operations for single lane use along East College Parkway may be in effect during portions of project construction
Project Consultants
- Design: AECOM Technical Services, Inc.
- Inspection: KCI Technologies, Inc.
- Contractors: Multiple Prime Contracts
Documents
- 2023-08-02 Phase IB/V Preconstruction Community Meeting Presentation
- 2023-08-02 Phase IB/V Preconstruction Community Meeting Video (Passcode: VWs%4k.8)
- 2023 Phase IB/V Construction Drawings 1 of 6
- 2023 Phase IB/V Construction Drawings 2 of 6
- 2023 Phase IB/V Construction Drawings 3 of 6
- 2023 Phase IB/V Construction Drawings 4 of 6
- 2023 Phase IB/V Construction Drawings 5 of 6
- 2023 Phase IB/V Construction Drawings 6 of 6
Location
- Green Holly Drive to Bay Dale Drive (1.24 miles)
For safety: No trespassing in construction zones is permitted
Location
- Bay Dale Drive to Anne Arundel Community College (AACC) at Peninsula Farm Road (2.47 miles)
Project Description
- Phase III is being constructed in concurrent segments.
Schedule
- See Department of Public Works - Broadneck Trail Phase III for schedule.
Project Status
- Bay Dale Drive to east of Jones Station Road: Final details and signage in process
- East of Jones Station Road to Peninsula Farm Road and AACC: Final details and signage in process
- Boardwalk at east of Jones Station Road: Not yet initiated
- Portions of College Parkway and cross streets within project limits will be impacted for final crosswalk installations and signal and intersection improvements
Project Consultants
- Design: Pennoni Associates, Inc.
- Inspection: KCI Technologies, Inc.
- Contractor: Urban Zink
Documents
Follow these links additional information.
- 2022-04-12 Phase III Pre Construction Community Meeting
- 2021 Phase III Construction Drawings 1 of 3
- 2021 Phase III Construction Drawings 2 of 3
- 2021 Phase III Construction Drawings 3 of 3
- 2019 - Phase III Design Plans
- 2019-02-25 - Phase III Community Meeting
- 2019 - Phase III Plan 1
- 2019 - Phase III Plan 2
- 2018-12-03 - Phase III Community Meeting
- 2018 - Phase III Map East
- 2018 - Phase III Map West
- 2017-07-26 - Phase III Community Meeting
Location
- Jones Station Road at B&A Trail to Peninsula Farm Road Connector (0.84 miles)
- Connectors: Jones Station Road MTA Park & Ride, B&A Trail
Location
- AACC at Peninsula Farm Road across MD Rte 2 to B&A Trail
For safety: No trespassing in construction zones is permitted
Location
- Log Inn Road to Oceanic Drive (0.81 miles)
- Spurs: Loop in Sandy Point Park passive area
Project Description
- Phase V will extend from Phase IB terminus and connect to Sandy Point State Park.
- Phase IB and Phase V are being constructed concurrently and will be constructed in segments.
Schedule
- See Department of Public Works - Broadneck Trail Phase V - Log Inn Road to Oceanic Drive for schedule
Project Status
- Log Inn Road to Sandy Point State Park Loop: Final details and signage in process
- Sandy Point Park Loop to Oceanic Drive Spur: Not yet initiated
- Flagman operations for single lane use along East College Parkway may be in effect during portions of project construction
Project Consultants
- Design: AECOM Technical Services, Inc.
- Inspection: KCI Technologies, Inc.
- Contractors: Multiple Prime Contracts
Documents
- 2023-08-02 Phase IB/V Preconstruction Community Meeting Presentation
- 2023-08-02 Phase IB/V Preconstruction Community Meeting Video (Passcode: VWs%4k.8)
- 2023 Phase IB/V Construction Drawings 1 of 6
- 2023 Phase IB/V Construction Drawings 2 of 6
- 2023 Phase IB/V Construction Drawings 3 of 6
- 2023 Phase IB/V Construction Drawings 4 of 6
- 2023 Phase IB/V Construction Drawings 5 of 6
- 2023 Phase IB/V Construction Drawings 6 of 6