Broadneck Peninsula Trail - Projects

See below for details of planning, design, and construction projects at Broadneck Peninsula Trail. 

Broadneck Penninsula Trail is a planned, paved 10’ wide asphalt trail generally located within the right of way of College Parkway in Arnold with a mainline length of approximately 8 miles. When complete, the trail will ultimately connect the B&A Trail to Sandy Point State Park with multiple spurs and connections to keys points of interest along the College Parkway corridor and the surrounding area.

In addition to the local transportation and recreation benefits of this project, Broadneck Trail also ties to routes of national significance. The connection of the Broadneck Trail to the B&A Trail provides important links to and will eventually serve as part of the American Discovery Trail, an east coast to west coast national trail system extending from Cape Henlopen, Delaware to Point Reyes, California and the East Coast Greenway, another national route extending north to south from Maine to Florida.

Broadneck Peninsula Trail is open dawn to dusk

Broadneck Peninsula Trail Master Plan 1999


The design and construction of this project is phased. Click on the pull down menu to find more details for each phase.


Location

  • Green Holly Drive to East College Parkway at Peregory Park Place (0.87 miles)
  • Spurs: Cape St. Claire to Walnut Ridge (0.19 miles), Broadneck Library, Broadneck Park

For safety: No trespassing in construction zones is permitted


Location

  • East College Parkway at Peregory Park Place to Log Inn Road (1.8 miles)
  • Spur: Bay Head Park (0.22 miles)

Project Description

  • Phase 1B will extend from existing Phase IA terminus and connect to Bay Head Park
  • Phase IB and Phase V are being constructed concurrently and will be constructed in segments.

Schedule


Project Status

  • Peregoy Park Place to Yorktown Road: Final details and signage in process
  • Yorktown Road to Log Inn Road: Paving, final details and signage in process
  • Bay Head Park Spur: Not yet initiated
  • Flagman operations for single lane use along East College Parkway may be in effect during portions of project construction

Project Consultants

  • Design: AECOM Technical Services, Inc.
  • Inspection: KCI Technologies, Inc.
  • Contractors: Multiple Prime Contracts 

Documents

Location

  • Green Holly Drive to Bay Dale Drive (1.24 miles)

For safety: No trespassing in construction zones is permitted      
 


Location

  • Bay Dale Drive to Anne Arundel Community College (AACC) at Peninsula Farm Road (2.47 miles) 

Project Description

  • Phase III is being constructed in concurrent segments.

Schedule


Project Status

  • Bay Dale Drive to east of Jones Station Road: Final details and signage in process
  • East of Jones Station Road to Peninsula Farm Road and AACC: Final details and signage in process
  • Boardwalk at east of Jones Station Road: Not yet initiated
  • Portions of College Parkway and cross streets within project limits will be impacted for final crosswalk installations and signal and intersection improvements

Project Consultants

  • Design: Pennoni Associates, Inc.
  • Inspection: KCI Technologies, Inc.
  • Contractor: Urban Zink

Documents

Follow these links additional information.

Location

  • Jones Station Road at B&A Trail to Peninsula Farm Road Connector (0.84 miles) 
  • Connectors: Jones Station Road MTA Park & Ride, B&A Trail

Location

  • AACC at Peninsula Farm Road across MD Rte 2 to B&A Trail

For safety: No trespassing in construction zones is permitted  
 


Location

  • Log Inn Road to Oceanic Drive (0.81 miles)
  • Spurs: Loop in Sandy Point Park passive area

Project Description

  • Phase V will extend from Phase IB terminus and connect to Sandy Point State Park.
  • Phase IB and Phase V are being constructed concurrently and will be constructed in segments.

Schedule


Project Status

  • Log Inn Road to Sandy Point State Park Loop: Final details and signage in process
  • Sandy Point Park Loop to Oceanic Drive Spur: Not yet initiated
  • Flagman operations for single lane use along East College Parkway may be in effect during portions of project construction

Project Consultants

  • Design: AECOM Technical Services, Inc.
  • Inspection: KCI Technologies, Inc.
  • Contractors: Multiple Prime Contracts 