Broadneck Penninsula Trail is a planned, paved 10’ wide asphalt trail generally located within the right of way of College Parkway in Arnold with a mainline length of approximately 8 miles. When complete, the trail will ultimately connect the B&A Trail to Sandy Point State Park with multiple spurs and connections to keys points of interest along the College Parkway corridor and the surrounding area.
In addition to the local transportation and recreation benefits of this project, Broadneck Trail also ties to routes of national significance. The connection of the Broadneck Trail to the B&A Trail provides important links to and will eventually serve as part of the American Discovery Trail, an east coast to west coast national trail system extending from Cape Henlopen, Delaware to Point Reyes, California and the East Coast Greenway, another national route extending north to south from Maine to Florida.
Broadneck Peninsula Trail is open dawn to dusk
Active Projects
The design and construction of this project is phased. Click on the pull down menu to find more details for each phase.
Location
- Green Holly Drive to East College Parkway at Peregory Park Place (0.87 miles)
- Spurs: Cape St. Claire to Walnut Ridge (0.19 miles), Broadneck Library, Broadneck Park
For safety: No trespassing in construction zones is permitted
Location
- East College Parkway at Peregory Park Place to Log Inn Road (1.8 miles)
- Spur: Bay Head Park (0.22 miles)
Project Description
- Phase 1B will extend from existing Phase IA terminus and connect to Bay Head Park
- Phase IB and Phase V are being constructed concurrently and will be constructed in segments.
Schedule
- Fall 2023 - Fall 2024
Project Status
- Peregory Park Place to Revell Downs Drive: clearing and sediment control installation in process
- Revell Downs Drive to Bay Head Road:
- Bay Head Road to Yorktown Road:
- Yorktown Road to Log Inn Road:
- Bay Head Park Spur:
Project Consultants
- Design: AECOM Technical Services, Inc.
- Inspection: KCI Technologies, Inc.
- Contractors: Multiple Prime Contracts
Documents
- 2023-08-02 Phase IB/V Preconstruction Community Meeting Presentation
- 2023-08-02 Phase IB/V Preconstruction Community Meeting Video (Passcode: VWs%4k.8)
- 2023 Phase IB/V Construction Drawings 1 of 6
- 2023 Phase IB/V Construction Drawings 2 of 6
- 2023 Phase IB/V Construction Drawings 3 of 6
- 2023 Phase IB/V Construction Drawings 4 of 6
- 2023 Phase IB/V Construction Drawings 5 of 6
- 2023 Phase IB/V Construction Drawings 6 of 6
Location
- Green Holly Drive to Bay Dale Drive (1.24 miles)
For safety: No trespassing in construction zones is permitted
Location
- Bay Dale Drive to Anne Arundel Community College (AACC) at Peninsula Farm Road (2.47 miles)
Project Description
- Phase III is being constructed in concurrent segments.
Schedule
- Summer 2022 - Spring 2024
Project Status
- Underground soil conditions resulted in delays and redesigning impacts to retaining walls and boardwalks
- Bay Dale Drive to Shore Acres Road: rough grading begun; retaining walls & boardwalk are in process
- Shore Acres Road to Kimwood Drive: grading, walls & boardwalk are in process
- Kimwood Drive to Jones Station Road East: paving installed; remaining features in process
- Jones Station Road East to Peninsula Farm Road: sediment controls installed; grading in progress
- AACC entrance improvements: installed; retaining wall to begin
Project Consultants
- Design: Pennoni Associates, Inc.
- Inspection: KCI Technologies, Inc.
- Contractor: Urban Zink
Documents
Follow these links additional information.
- 2022-04-12 Phase III Pre Construction Community Meeting
- 2021 Phase III Construction Drawings 1 of 3
- 2021 Phase III Construction Drawings 2 of 3
- 2021 Phase III Construction Drawings 3 of 3
- 2019 - Phase III Design Plans
- 2019-02-25 - Phase III Community Meeting
- 2019 - Phase III Plan 1
- 2019 - Phase III Plan 2
- 2018-12-03 - Phase III Community Meeting
- 2018 - Phase III Map East
- 2018 - Phase III Map West
- 2017-07-26 - Phase III Community Meeting
Location
- Jones Station Road at B&A Trail to Peninsula Farm Road Connector (0.84 miles)
- Connectors: Jones Station Road MTA Park & Ride, B&A Trail
Location
- AACC at Peninsula Farm Road across MD Rte 2 to B&A Trail
For safety: No trespassing in construction zones is permitted
Location
- Log Inn Road to Oceanic Drive (0.81 miles)
- Spurs: Loop in Sandy Point Park passive area
Project Description
- Phase V will extend from Phase IB terminus and connect to Sandy Point State Park.
- Phase IB and Phase V are being constructed concurrently and will be constructed in segments.
Schedule
- Fall 2023 - Fall 2024
Project Status
- Log Inn Road to Oceanic Drive
- Sandy Point Park Loop:
Project Consultants
- Design: AECOM Technical Services, Inc.
- Inspection: KCI Technologies, Inc.
- Contractors: Multiple Prime Contracts
Documents
- 2023-08-02 Phase IB/V Preconstruction Community Meeting Presentation
- 2023-08-02 Phase IB/V Preconstruction Community Meeting Video (Passcode: VWs%4k.8)
- 2023 Phase IB/V Construction Drawings 1 of 6
- 2023 Phase IB/V Construction Drawings 2 of 6
- 2023 Phase IB/V Construction Drawings 3 of 6
- 2023 Phase IB/V Construction Drawings 4 of 6
- 2023 Phase IB/V Construction Drawings 5 of 6
- 2023 Phase IB/V Construction Drawings 6 of 6