South Shore Trail is a planned, paved 10’ wide asphalt trail generally utilizing the abandoned right of way of the Washington, Baltimore & Annapolis (WB&A) Railroad between Annapolis and Odenton, wherever feasible.

When complete, the trail will ultimately connect with the Colonial Annapolis Maritime Route on the east and the WB&A Trail on the west. This trail will provide significant local regional recreational and transportation benefits with multiple spurs and connections to keys points of interest along its route and the surrounding area.

South Shore Trail will eventually tie to other existing & proposed shared use routes in the Odenton Town Center area to the north and also ties to designated routes of national significance to the south. The connection of the South Shore Trail to the WB&A Trail and subsequently extension to the trail network in Prince George’s County provides an important link to the American Discovery Trail, an east coast to west coast national trail system extending from Cape Henlopen, Delaware to Point Reyes, California and the East Coast Greenway, another national route extending north to south from Maine to Florida.


The design and construction of this project is phased. Click on the pull down menu to find more details for each phase.


Location

  • Ticker Lane at Waterbury Road to Hansel Drive at Millersville Road (1.66 miles)

Location

  • Sappington Station Road to Holiday Park Road at Bonheur Avenue (1.86 miles)

Project Description

  • Phase II will be constructed in concurrent segments.

Schedule

  • Winter 2024 - Spring 2025

Project Status

  • Sappington Station Circle to Burns Crossing Road:
  • Burns Crossing Road to Gambrills Road:
  • Gambrills Road to Holiday Park Road:
  • Holiday Park Road to Bon Heur Avenue:

Project Consultants

  • Design: Pennoni Associates Inc.
  • Inspection: TBD
  • Contractor: TBD 

Documents

Location

  • Honeysuckle Lane to Bestgate Road

Project Description

  • Phase III and Phase IV will be designed concurrently
  • Phase III and Phase IV will be constructed separately 

Schedule

  • Fall 2023 - Spring 2024

Project Status

  • Feasibility, design and right-of-way determination is in process

Project Consultants

  • Design: Pennoni Associates Inc.
  • Inspection: Future
  • Contractor: Future

 

Location

  • Ticker Lane at Waterbury Road to Honeysuckle Lane

Project Description

  • Phase III and Phase IV will be designed concurrently
  • Phase III and Phase IV will be constructed separately

Schedule

  • Fall 2020 - Spring 2024

Project Status

  • Feasibility, design and right-of-way determination is in process

Project Consultants

  • Design: Pennoni Associates Inc.
  • Inspection: Future
  • Contractor: Future

Documents   

Location

  • Medical Parkway to Bestgate Road - Behind Annapolis Mall/Annapolis Plaza/Belcher Pavilion at AAMC (0.48 miles) 
  • Connectors: Annapolis Mall, Arundel Plaza, AAMC

Location

  • Bestgate Road to City of Annapolis


Last updated on