Capital Project Design and Construction Updates

Broadneck Park

613 College Pkwy,

Annapolis, MD 21409

Project Status: Completed

Description of Work: Stormwater Improvements

The stormwater facility located adjacent to field #3 will be retrofitted to meet current state and county regulations. Additional stormwater management features will be installed beyond the outfield to provide additional control and conveyance of stormwater runoff from the site. Construction will occur Mid-April 2019 until June 2019. The park will remain open during construction.
 

Hancock’s Resolution

2795 Bayside Beach Rd,

Pasadena, MD 21122

Project Status: Pending construction contract issuance

Description of Work: New Visitor Center

This work will include the construction of a new visitor center, stormwater management, landscaping parking, and associated amenities. The construction will begin Summer 2019 and be completed in June 2020.


Severn Danza Park 

726 Donaldson Ave, 

Severn, MD 21144

Project Status: Completed

Description of Work:  New Field Lighting 

Portions of the park will be closed for the construction of new field lighting. The lighting will be installed on Fields 9 and 10. Construction will begin late November/early December and proceed to March 2019. The park will remain open during construction.


Matthewstown Harmans Park

7549,7551,7553 Teague Rd 

Hanover, MD 21076

Project Status: Under Construction 

Description of Work:  Park Enhancements 

The proposed improvements will consist of a park access road, additional parking, walking trails, pavilions, playgrounds, multi-purpose fields, stormwater management, and utility connections. The project will begin construction March 2019 and will be completed in early 2020. This work will have minimal impact to Joe Cannon Stadium and the existing amenities onsite.  The remainder of the park will remain open during construction.


Thomas Point Park Shoreline Restoration
 

3890 Thomas Point Road

Annapolis, MD 21403

Project Status: Completed

Description of Work:

Please be advised that Thomas Point Park will be closed from October 8, 2018 through November 14, 2018 due to a shoreline restoration project on Fishing Creek along the park entrance road. The contractor will have heavy equipment and materials transported along the road, and stored within the roadbed such that the road will not allow passage for fishermen and park patrons. We apologize for this inconvenience but it is critical to saving a section of the shoreline within this park. Your cooperation and understanding will be greatly appreciated. Anne Arundel County Department of Recreation and Parks 410-222-7317


Tennis Center at Millersville Park

1580 Millersville Road

Millersville, MD 21108

Project Status:

The schematic (30%) plans will be reviewed and discussed with the Millersville Tennis Center Advisory Committee. Currently the plans include 16 outdoor courts, 8 indoor courts, a perimeter exercise trail, sun shelters, storage building, parking, and a possible concession-restroom building.

The Advisory Committee is comprised of three representatives from the Tennis Alliance, three community members and an at-large member. The Committee is chaired by Rick Anthony, Director of Recreation and Parks. Staff from Recreation and Parks and Public Works will assist the Committee. It is anticipated that the design will be complete in July 2019 and construction will commence in November 2019.

Description of Work:

This project proposes to design and construct an indoor and an outdoor tennis center at Millersville Park as a public private partnership with the Tennis Alliance of Anne Arundel County.

 

Feasibility Study, Market Analysis and Business Plan

Traffic Study


Eisenhower Golf Course Renovation and Stream Restoration 
 
1576 Generals Hwy
 
Crownsville, MD 21032

Project Status: Under Construction

This park is closed until Spring 2020.
 
Description of Work: Golf Course Renovation 
 

This project includes the permitting, and construction of improvements to the golf course to include: irrigation upgrades, tree pruning, rebuilding of the greens, bunkers, and surrounds,  Bermuda tee & fairway conversion, drainage improvements and cart path Repairs.  In addition to this work, DPW- WPRP will be completing a stream restoration project on this property.   The golf course will be closing October 2018 and will re-open Spring 2020.

Public Meeting for the Redevelopment

Meeting Minutes


South Shore Trail - Phase I
 
Hansel Drive to Waterbury Road
 
Millersville, MD 21108
 
Description of Work: Paved Multi-use Trail
 
Construction began on this project in October 2017. Please click here for more details.

Broadneck Peninsula Trail - Phase II
 
Green Holly Drive to Bay Dale Drive
 
Arnold, MD 21012
 
Description of Work: Paved Multi-use Trail
 
Construction began on this project in April 2018. Please click here for more details.

North Aquatic Swim Center 

7888 Crain Hwy S.

Glen Burnie, MD 21061

Project Status: Completed

Description of Work: 

This project will replace the air exchange pool paks, renovate the existing water slide and associated renovations to the Aquatic Center.

The aquatic center will be closed for construction beginning on May 5, 2018, and REOPENED on June 20th.


Bell Branch Park

2400 Davidsonville Rd

Gambrills, MD 21054    

Project Status:  Completed

Description of Work: Dog Park Closing - * Dog Park was reopened on 10/8/2018

The dog park at Bell Branch will be closed during the construction of the new synthetic turf fields. The closing is scheduled to begin on or around May 14, 2018. The dog parks at Maryland City,  Broadneck Park and Quiet Waters Park will serve as alternate locations. Please remain out of the construction areas until all work is completed. The dog park will reopen 10/8/18. However, the dog park water will remain off.

Description of Work: Installation of Two Turf Fields 

Portions of the park will be closed for installation of two synthetic turf fields and associated improvements. The fields to be replaced are located in the rear of the park.  Site amenities include improved field lighting, bleachers, scoreboards, pathways, and goals. Construction will begin on or around May 14, 2018, and will continue until November 2, 2018. Please remain out of the construction areas until all work is completed.


Loch Haven Park

3424 Pocahontas Drive

Edgewater, MD 21037

Project Status: Under Construction

Description of Work: New Field Lighting

Portions of the park will be closed for the construction of new field lighting. The lighting will be installed on one of the baseball fields. Construction will begin late November/early December and proceed through May 2019. The park will remain open during construction.


Towsers Branch Park

1405 Jackson Rd

Odenton, Md 21113

Project Status: Open but additional improvements are pending

Description of Work: Dog Park Installation  

Portions of the park will be closed for the construction of a new dog park.  The dog park will include large and small dog areas as well as one rotational field.  The tennis courts will be removed. Parking is available on site. Water fountains for pets and humans will not be installed at this time. Users should bring water for their consumption. Construction will begin on  April 9, 2018, and was completed in May 2018. The dog park is now reopened.

Installation of water line is pending. This work should be completed by December 2018. The waterline was installed in April 2019 and is operational.


 

Loopers Field

20 North Shore Rd

Pasadena, MD 21122

Project Status: Completed

Description of Work:  Park Improvements

This work will include:

  • Expanded Parking lots;

  • ADA Accessible pathways;  

  • New well and septic systems;

  • New scoreboard;

  • New press box; and

  • New concession/restroom building.

 

The park will be closed for all activities including access to the natural trails. The trail remains open and walkers can enter the red/yellow trails at Three Sisters Drive Equestrian access is at Lake Shore Athletic Complex,  850 Woods Rd, Pasadena Md. 21122.

The park will be closed from December 2017 until October 20, 2018. The management deer hunts will begin October 15, 2018 on this site. The park was reopened on January 8th, 2019


 

Fort Smallwood Park

9500 Fort Smallwood Road

Pasadena, MD 21122

Project Status: Pending Notice to Proceed

Description of Work: Shoreline Stabilization Phase I Reach 3

This project is for the design and construction of multiple phases for shoreline protection around Fort Smallwood Park.   This work will occur between the battery and the boat ramp, closing the fishing pier  There is a  public meeting scheduled for May 20th, 7 pm at Fort Smallwood Elementary School, 1720 Poplar Ridge Rd, Pasadena, MD 21122, USA   Construction will occur June 1, 2019, until December  2019. The park will remain open during construction; however, the fishing pier and parking in the vicinity will be closed. Please avoid construction areas

Project Status: Complete

Description: Rehabilitation of the Historic Concession Building

This project is for the reconstruction, rehabilitation, and renovation of a historic concession building, and related work including:

  • New water and electric service;

  • New septic system;

  • New paved walkways; and

  • New landscape plantings.

The concession stand is open as of July 2018.


Jack Creek Park 

1600 Snug Harbor Rd
 
 Shady Side, MD 20764  

Project Status: Pending Notice to Proceed

Description of Work: Shoreline Stabilization- Phase 2 and Park Improvements
 
Phase II of this project consists of Construction of shoreline protection measures;  Construction of landward improvements to the park's infrastructure including access road, parking, and loading areas and soft launch; and installing landscape mitigation and marsh planting. The park will be closed from June 1 through December 2019.  Park patrons are encouraged to visit Shadyside Park or Discovery Village for car-top launches and Shady Cove Natural Area for trails.