Skip Navigation
Page Background
Close
 
 

Broadneck Peninsula Trail

Page Published: October 21, 2022
Address: Multiple Locations (See Address Below) 
Description of Work:

1-2. Paved multi-use trail
 

Address:
1. Phase IB/V: East College Parkway at Peregoy Place to Sandy Point State Park with a spur to Bay Head Park, Annapolis 21409
 
2. Phase III: Bay Dale Drive to Peninsula Farm Road, Arnold 21012


Broadneck Peninsula Trail

 
Consultants: 1. AECOM
2. Pennoni Associates, Inc.  
Project Status:

1. In Design (≈95%)
2. Under Construction

 
Project Updates:

1. Phase IB/V: Lease with DNR approved by Board of Public Works. You may watch the presentation video, review the slides, drawings, or Q&A report.

2. Phase III: Sediment controls in place, clearing begun. This construction is scheduled to consume 18 months. Follow these links for the presentation video, slides, or design plans. Please click here for other trail information.
 

Community Meeting Presentations

 
Image:  Image