PROCESS SKIP SDP 12312 1000 BRANDON SHORES ROAD 4/24/2012 A 6/13/2012 REGIONAL 0 3 3
PROCESS
STANDARDS
SKIP SDP, SKIP PP, SWM - DESIGN MANUAL 12502 1008 OLD ELKRIDGE LANDING ROAD, LOT 1A 8/23/2012 A 10/3/2012 NORTH 0 5 1
PROCESS
STANDARDS
ENVIRONMENTAL
ROAD IMPROVEMENTS; STEEP SLOPES; COMMUNITY MEETING 12574 11 LEELAND ROAD, EDGEWATER 10/5/2012 A 11/1/2012 CRITICAL AREA 0 1 7
PROCESS
ENVIRONMENTAL
STEEP SLOPES/COMMUNITY MEETING 12310 1137 BAY RIDGE ROAD 4/24/2012 A 5/30/2012 CRITICAL AREA 0 2 6
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12413 117 SYCAMORE RD 6/25/2012 A 8/1/2012 NORTH 0 3 3
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12374 1239 WASHINGTON DRIVE 6/4/2012 A 6/27/2012 CEB 0 2 6
PROCESS R/W ROAD IMPROVEMENTS 12266 1251 WASHINGTON DRIVE 3/22/2012 A 5/2/2012 SOUTH 0 2 6
PROCESS SDP
COMMUNITY MEETING
12313 1265 MT. PLEASANT DR 4/25/2012 A 5/23/2012 NORTH 1 3 5
STANDARDS ROAD IMPROVEMENTS; DESIGN MANUAL 12345 1272 THOMPSON AVE 5/17/2012 A 6/20/2012 SOUTH 0 4 2
PROCESS SKIP SITE DEVELOPMENT PLAN & COMMUNITY MEETING 12483 1300 DEFENSE HIGHWAY 8/14/2012 A 9/5/2012 SOUTH 0 2 7
STANDARDS ROW WIDENING; ROAD IMPROVEMENTS 12404 145 KENTUCKY AVE 6/20/2012 A 8/1/2012 CRITICAL AREA 1 3 3
PROCESS SKIP SDP; COMMUNITY MEETING 12431 1522 JABEZ RUN 7/5/2012 A 8/1/2012 SOUTH 0 4 4
PROCESS
ENVIRONMENTAL
STEEP SLOPES & BUFFER; COMMUNITY MEETING 12449 158 WEST LAKE DRIVE 7/18/2012 A 8/15/2012 CRITICAL AREA 0 2 6
STANDARDS ROW WIDENING; ROAD IMPROVEMENTS 12291 161 RYAN RD 4/4/2012 A 5/9/2012 NORTH 0 3 3
ENVIRONMENTAL DISTURBANCE TO WETLANDS BUFFER, STREAM BUFFER, STEEP SLOPES BUFFER, COMMUNITY MEETING 11861 1632 WINCHESTER ROAD 7/19/2011 A 3/28/2012 CRITICAL AREA 0 3 5
STANDARDS ROW & PAVEMENT WIDTH 12453 1710 BARGERS RD 7/20/2012 A 8/12/2012 SOUTH 0 2 7
PROCESS
STANDARDS
ROAD IMPROVEMENTS; APPLICATION FEE 12453R 1710 BARGERS RD 9/19/2012 A 9/19/2012 SOUTH 0 2 6
PROCESS SKIP SDP 11244R 1800 JACKSON GROVE ROAD 4/24/2012 A 4/25/2012 SOUTH 0 4 2
PROCESSES PRELIMINARY PLAN 12370 1825 POPLAR RIDGE RD (FORMERLY KESHISHIAN PROPERTY) 6/1/2012 A 8/15/2012 CRITICAL AREA 0 3 3
STANDARDS ROW WIDENING AND ROAD IMPROVEMENTS 12466 1900 SURF CIRCLE 8/1/2012 A 8/22/2012 CRITICAL AREA 0 3 3
STANDARDS PRELIMINARY PLAN REQUIREMENTS; FLOODPLAIN REQUIREMENTS 12425 191 FAIRHAVEN ROAD 7/2/2012 A 8/15/2012 SOUTH 1 8 7
ENVIRONMENTAL STEEP SLOPES; COMMUNITY MEETING 12479 194 SEVERN WAY 8/13/2012 A 9/5/2012 CRITICAL AREA 0 3 5
PROCESS SUBDIVISION & COMMUNITY MEETING 12192 1ST MARINER BANK/PHIPPS PROPERTY 1/31/2012 A 3/22/2012 CRITICAL AREA 0 2 6
STANDARDS RIGHT OF WAY WIDENING; ROAD IMPROVEMENTS 12290 204 GRANDE VIEW AVE 4/4/2012 A 5/9/2012 SOUTH 0 1 7
PROCESS SKIP SDP; COMMUNITY MEETING 12306 221 BAY DALE DR - JOY IN LEARNING 4/20/2012 A 6/13/2012 CRITICAL AREA 0 3 5
PROCESS; STANDARDS SKIP SDP; LANDSCAPE MANUAL 12214 25 THOMAS AVE. 2/13/2012 A 2/29/2012 REGIONAL 0 5 1
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12468 254 CARROLL ROAD 8/6/2012 A 9/19/2012 CRITICAL AREA 0 3 3
PROCESS
STANDARDS
ENVIRONMENTAL
COMMUNITY MTG, R/W ROAD IMPROVEMENTS/ STEEP SLOPE & BUFFERS 12208 2631 GREENBRIAR LANE 2/9/2012 A 3/22/2012 CRITICAL AREA 0 2 6
PROCESS STEEP SLOPE BUFFER; COMMUNITY MEETING 12240 266 CYPRESS CREEK ROAD 3/1/2012 A 3/22/2012 CRITICAL AREA 0 3 5
PROCESS
ENVIRONMENTAL
STEEP SLOPES; COMMUNITY MEETING 12277 2694 PINECREST DRIVE 3/29/2012 A 4/25/2012 CRITICAL AREA 0 2 7
PROCESS SKIP SUBDIVISION 12140 2701 WILLOW HILL RD 12/19/2011 A 2/1/2012 CRITICAL AREA 0 2 6
STANDARDS ROAD FRONTAGE 12395 2825 SOUTHHAVEN DR 6/15/2012 A 7/18/2012 KAK 1 2 6
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12414 30 BOONE TRAIL 6/25/2012 A 8/1/2012 CRITICAL AREA 1 3 3
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 12198 3173 HARNESS CREEK RD 2/3/2012 A 2/8/2012 CRITICAL AREA 0 2 6
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12283 3259 ARUNDEL ON THE BAY 4/2/2012 A 7/18/2012 CRITICAL AREA 0 2 6
PROCESS; ENVIRONMENTAL STEEP SLOPE BUFFER; SUBDIVISION PROCESS; COMMUNITY MEETING 12489 328 OAKDALE RD 8/17/2012 A 10/3/2012 CRITICAL AREA 1 3 3
ENVIRONMENTAL STEEP SLOPES 12377 334 S. RIVERSIDE DR. 6/5/2012 A 7/18/2012 VLC 0 2 4
ENVIRONMENTAL WETLANDS BUFFER DISTURBANCE 12294 3504 ROCKWAY AVE 4/13/2012 A 5/23/2012 CRITICAL AREA 0 2 6
STANDARDS ROW/ WIDTH/PAVEMENT 12380 3707 PARKE DRIVE 6/6/2012 A 6/27/2012 CEB   1 7
ENVIRONMENTAL SS, DISTURBANCE TO NON-TIDAL WETLANDS 12267 371 RITCHIE HIGHWAY 3/22/2012 A 7/18/2012 NORTH 0 3 5
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12274 408 ROYAL BEACH RD 3/26/2012 A 5/2/2012 CRITICAL AREA 0 3 3
PROCESS  ENVIRONMENTAL STEEP SLOPES & BUFFERS & COMMUNITY MEETING 12408 4080 MUDDY CREEK ROAD 6/21/2012 A 7/18/2012 SOUTH   1 7
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12332 425 KENTUCKY AVENUE 5/7/2012 A 5/16/2012 CRITICAL AREA 1 3 3
PROCESS
ENVIRONMENTAL
STEEP SLOPES AND BUFFER; COMMUNITY MEETING 12491 4657 BAYFIELD ROAD 8/20/2012 A 9/26/2012 CRITICAL AREA 0 1 7
PROCESS SDP; COMMUNITY MEETING 12326 4760 MOUNTAIN ROAD 5/2/2012 A 6/6/2012 NORTH 0 3 3
PROCESS AMENDED PLAT 12289 483 SAINT BARBARA LN 4/4/2012 A 5/23/2012 SOUTH 0 4 4
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12203 4928 LEE BOULEVARD 2/6/2012 A 3/14/2012 CRITICAL AREA   7 7
PROCESS AMENDED PLAT 12311 504 BINGHAM CT 4/23/2012 A 5/16/2012 NORTH 0 3 5
Process Skip SDP Process and Proceed to Building Permit 10526 522 Defense Highway 7/16/2009 A   South 0 2 6
PROCESS SUBDIVISION PROCESS TO LEGALIZE A PARCEL 11467 5224 SANDS ROAD 12/15/2010 A   CRITICAL AREA 0 8 7
STANDARDS ROAD IMPROVEMENTS 12490 563 HIGHBANK RD 8/17/2012 A 9/26/2012 CRITICAL AREA 1 3 5
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12462 612 SALTZMAN ROAD 7/30/2012 A 8/22/2012 CRITICAL AREA 0 3 5
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12297 614 EMERSON PLACE 4/17/2012 A 6/6/2012 CRITICAL AREA 1 3 5
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 11298 6549 MALLARD LANE 8/26/2010 A   CRITICAL AREA 0 8 8
STANDARDS
ENVIRONMENTAL
R-O-W ROAD FRONTAGE IMPROVEMENTS 11298A 6549 MALLARD LANE 9/29/2010 A   CRITICAL AREA 0 8 8
Environment Disturb 25-ft buffer 9933 7205 Larrimore Rd / Larrimore Property 4/24/2008 A   Critical Area 0 5 2
PROCESS SKIP SDP 11341 7519 RITCHIE HWY 9/22/2010 A   NORTH 0 2 5
Environment Forest Conservation Threshold 9617 7522 Teague Rd 5/7/2007 A   South 0 4 5
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12273 755 205TH ST 3/26/2012 A 5/9/2012 NORTH 0 3 3
STANDARDS ROW; WIDENING & SPOT 12185 7608 BEAVER RD 1/26/2012 A 2/29/2012 NORTH 0 3 5
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12369 766 N HOLLY DR (AMBERLEY LOTS 53 & 54) 6/1/2012 A 7/3/2012 CRITICAL AREA 0 3 5
PROCESS SKIP SDP; COMMUNITY MEETING 12481 766 OLD HAMMONDS FERRY RD 8/13/2012 A 8/15/2012 REGIONAL 0 5 1
ENVIRONMENTAL STEEP SLOPES BUFFER; COMMUNITY MEETING 12131 7730 W. SHORE ROAD 12/12/2011 A 5/23/2012 KAK 0 3 3
PROCESS SKIP AMENDED PLAT 12418 7820 TRUITT LN, LOT 36 6/27/2012 A 8/1/2012 SOUTH 0 4 2
STANDARDS ROAD IMPROVEMENTS 12556 7899 CAMP ROAD, GREENHAVEN, LOTS 36, 37 & P/O 38 9/28/2012 A 11/1/2012 SOUTH 0 3 3
PROCESS FOREST CON REQU; PRELIM PLAN; SDP 12325 8001 OLD JESSUP ROAD 5/2/2012 A 5/23/2012 SOUTH 0 4 1
STANDARDS ROAD & R/W IMPROVEMENTS 12338 8120 ARMIGER DRIVE, LOT 24 5/9/2012 A 7/18/2012 NORTH 1 3 3
PROCESS SKIP SDP; COMMUNITY MEETING 12484 8191 RITCHIE HWY 8/14/2012 A 8/22/2012 REGIONAL 0 3 3
STANDARDS ROAD IMPVTS/DESIGN MANUAL 12463 8220 QUARTERFIELD ROAD 7/31/2012 A 8/12/2012 SOUTH 0 4 2
PROCESS COMMUNITY MEETING; SDP 11935A 8237 BALITMORE ANNAPOLIS BLVD - SHORTRIDGE PROPERTIES 6/22/2012 A 10/12/2012 NORTH 0 3 5
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12272 8251 CARTERS LN 3/26/2012 A 5/23/2012 NORTH 0 3 5
PROCESS, STANDARDS, ENVIRONMENTAL REC AREA-FEE-IN-LIEU,RD IMPVTS,LANDSCAPE BUFFERS, FOREST CON ESMNTS <10,000 SQ' 12323 8437 BROCK BRIDGE RD 5/1/2012 A 6/27/2012 REGIONAL 9 4 4
STANDARDS ROW WIDTH 12626 854 WILSON ROAD, ARNOLD 11/14/2012 A 12/12/2012 NORTH 0 3 5
PROCESS; REQUIREMENTS PRELIMINARY PLAN REVIEW; ROW ROAD FRONTAGE IMPROVEMENTS; COMMUNITY MEETING 12433 864 MAPLE ROAD 7/9/2012 A 9/5/2012 SOUTH 0 4 4
PROCESS
ENVIRONMENTAL
NON-TIDAL WETLAND & BUFFER DISTURBANCE; STREAMS & BUFFER DISTURBANCE; COMMUNITY MEETING 12260 879 WOODS ROAD 3/16/2012 A 5/30/2012 CRITICAL AREA 0 3 3
ENVIRONMENTAL FOREST CONSERVATION; CLEARING BELOW THRESHOLD; REFORESTATION 12440 8797 VETERANS HIGHWAY 7/12/2012 A 8/22/2012 SOUTH 0 2 2
PROCESS SKIP SDP; SKIP PRELIMINARY 12632 910 RITCHIE HWY, SEVERNA PARK 11/15/2012 A 12/20/2012 NORTH 0 3 5
STANDARDS ROAD WIDENING & RIGHT OF WAY 12344 929 DIGGS ROAD (HERALD HARBOR) 5/16/2012 A 6/13/2012 SOUTH 0 2 4
STANDARDS ROW; ROAD IMPROVEMENTS 12184 930 ROSE ANNE RD 1/26/2012 A 3/7/2012 NORTH   5 2
PROCESS
ENVIRONMENTAL
FOREST CONSERVATION REQUIREMENTS; FOREST CON FEE-IN-LIEU 12158 AA CO - CENTRAL ELEMENTARY SCHOOL 1/5/2012 A 2/8/2012 REGIONAL 1 7 0
STANDARDS FLOODPLAIN DISTURBANCE F12-003 AA CO - ODENTON TOWN CENTER SEWER INTERCEPTOR 3/2/2012 A 3/21/2012 REGIONAL 0 4 2
PROCESS
ENVIRONMENTAL
PRELIMINARY PLAN; SDP; FOREST CONSERVATION 12424 AA CO. KINDER FARM PARK 6/29/2012 A 7/9/2012 REGIONAL 0 3 5
PROCESS ALLOW LOD TO BE USED FOR FOREST CON CALC; WIAIVE FEE-IN-LIEU; MOD FEE 12487 AA COUMMUNITY COLLEGE - LUDLUM HALL 8/15/2012 A 9/19/2012   0 3 3
STANDARDS FOREST CONSERVATION REQUIREMENTS 12505 AA COUNTY - ARAC TRACK 8/27/2012 A 10/3/2012 NORTH 0 3 3
ENVIRONMENTAL FOREST CONSERVATION REQUIREMENTS 12211 AACO - ANNAPOLIS HIGH SCHOOL 2/10/2012 A 3/7/2012 SOUTH 0 3 6
PROCESS FOREST CONSERVATION REQUIRMENTS 12219 AACO - BODKIN ELEMENTARY SCHOOL (CAPITAL PROJECT) 2/16/2012 A 3/22/2012 NORTH 0 3 3
ENVIRONMENTAL FOREST CONSERVATION REQUIREMENTS 12121 AACO - SEVERNA PARK ELEMENTARY SCHOOL 12/7/2011 A 5/9/2012 NORTH 0 3 5
ENVIRONMENTAL FOREST CONVERSATION REQUIREMENTS 12247 AACO - SOUTH SHORE ELEMENTARY SCHOOL 3/6/2012 A 3/7/2012 SOUTH 0 2 4
FP FLOODPLAIN DISTURBANCE F12-002 ADMIRALS RIDGE 2/22/2012 A 8/22/2012 NORTH 42 3 5
STANDARDS
ENVIRONMENTAL
WETLAND BUFFER; REC AREA; STREAM BUFFER; STREAM CROSSING FOR UTILITIES; SWM PROCEDURES; ROAD DESIGN MANUAL 12229A ADMIRALS RIDGE 5/30/2012 A 11/7/2012 NORTH 0 3 5
ENVIRONMENTAL SPECIMEN TREES 9714R ADMIRALS RIDGE 5/30/2012 A 11/15/2012 NORTH 0 3 5
STANDARDS PLAT SCALE 12286 AISQUITH PROPERTIES 4/3/2012 A 6/20/2012 SOUTH 0 1 7
PROCESS TIME EXTENSION 12456 ALICE KING PROPERTY 7/23/2012 A 8/1/2012 SOUTH 1 1 7
PROCESS TIME EXTENSION FOR RESUBMITTAL 12187 ALTA AT THE TOWN CENTER 1/30/2012 A 2/15/2012 REGIONAL 214 4 4
PROCESS
ENVIRONMENTAL
TIME EXTENSION FOR RESUBMITTAL; SPECIMEN TREE REMOVAL; STREET ABANDONMENT; WETLANDS BUFFER DISTURBANCE 12422 ALTA AT THE TOWN CENTER 6/29/2012 A 7/30/2012 REGIONAL 214 4 4
STANDARDS; ENVIRONMENTAL ROW ROAD FRONTAGE IMPROVEMENTS; DISTURBANCE & GRADING TO STEEP SLOPES AND BUFFER; COMMUNITY MEETING 12513 ALTOONA BEACH LOTS 46 & 47 8/30/2012 A 12/19/2012 CRITICAL AREA 0 3 3
PROCESS TIME EXTENSION FOR RESUBMITTAL 12165 ALTOONA BEACH, THE WOODS AT 1/6/2012 A 1/18/2012 CRITICAL AREA 3 3 41
PROCESS REDUCE PRELIMINARY PLAN SUBMITTAL FEE; LANDSCAPE MANUAL 12167 AMJ REALTY PROPERTY (7926 SOLLEY RD) 1/9/2012 A 2/29/2012 REGIONAL 0 3 3
PROCESS SKIP PRELIMINARY PLAN AND SDP 12553 ANNAPOLIS COMMONS 9/26/2012 A 10/3/2012 REGIONAL 0 2 6
ENVIRONMENTAL WETLANDS & BUFFERS; STEEP SLOPES & BUFFERS; STREAM BUFFERS; SPECIMEN TREE REMOVAL; FOREST CON REQ 12621A ANNAPOLIS COMMONS STREAM RESTORATION 11/19/2012 A 11/20/2012 REGIONAL 0 2 6
FP DISTURBANCE TO FP F12-016 ANNAPOLIS COMONS STREAM RESTORATION 11/9/2012 A 11/20/2012 REGIONAL 0 6 2
ENVIRONMENTAL, PROCESS, STANDARDS STEEP SLOPES; COMMUNITY MEETING; R-O-W WIDTH 12176 ANNAPOLIS ROADS, LOT 14 SEC E 1/18/2012 A 3/22/2012 CRITICAL AREA 0 2 6
PROCESS TIME EXTENSION FOR APPROVAL 12537 ANNAPOLIS RT 2/WHARTON-ANNAPOLIS LLC 9/19/2012 A 10/12/2012 REGIONAL 0 2 6
PROCESS SKIP SDP 10424RR ANNAPOLIS TOWNE CENTER @ PAROLE (WILD WILLIES) 6/4/2012 A 6/13/2012 REGIONAL 0 6 2
PROCESS SKIP SDP 12205 ANNAPOLIS TOWNE CENTRE - BLDG 2 2/8/2012 A 2/29/2012 REGIONAL 0 2 6
PROCESS
ENVIRONMENTAL
SKIP SDP; ADEQUACY OF PUBLIC FACILITIES; COMMUNITY MEETING 12516 ARUNDEL CHRISTIAN CHURCH 8/31/2012 A 11/20/2012 NORTH 0 3 2
PROCESS SKIP PRE-SUBMITTAL MEETING 12136 ARUNDEL FOREST 12/15/2011 A 2/8/2012   0 4 1
STANDARDS
ENIVIRONMENTAL
WETLANDS & BUFFER DIST; SPECIMEN TREE REMOVAL; STREAM BUFFERS; DESIGN MANUAL 11419 ARUNDEL GATEWAY 11/10/2010 A 3/7/2012 REGIONAL 0 4 4
PROCESS TIME EXTENSION FOR RESUBMITTAL 12358 ARUNDEL GATEWAY PUMPING STATION 5/23/2012 A 6/13/2012 REGIONAL 0 4 4
PROCESS TIME EXTENSON FOR RESUB 12359 ARUNDEL GATEWAY PUMPING STATION 5/23/2012 A 6/13/2012 REGIONAL 0 4 4
PROCESS TIME EXTENSION 12494 ARUNDEL GATEWAY PUMPING STATION 8/21/2012 A 9/12/2012 REGIONAL 0 4 4
PROCESS TIME EXTENSION 12495 ARUNDEL GATEWAY PUMPING STATION 8/21/2012 A 9/12/2012 REGIONAL 0 4 4
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS; OPEN SPACE REC AREA 12309 ARUNDEL ON THE BAY, LOTS D E F & P/O I, BLK 7 4/23/2012 A 6/13/2012 CRITICAL AREA 0 2 7
PROCESS ALLOW TO PROCEED AS A MINOR 12112 ARUNDEL ON THE BAY, LOTS D, E, F & P/O I, BLK 7 12/1/2011 A 1/18/2012 CRITICAL AREA 0 2 6
PROCESS TIME EXTENSION 12317 ARUNDEL WOODS PUD 4/26/2012 A 5/2/2012 SOUTH 0 4 1
PROCESS TIME EXTENSION FOR COMPLETION OF SUBDIVISION AND APF'S 12430 ARUNDEL WOODS PUD 7/3/2012 A 7/11/2012 SOUTH 0 4 1
PROCESS TIME EXTENSION 12509 ARUNDEL WOODS PUD 8/29/2012 A 9/5/2012 SOUTH 68 4 1
PROCESS CONTENTS OF A RECORD PLAT; MODIFICATION APPLICATION FEE 12525 ARUNDEL WOODS PUD 9/12/2012 A 9/12/2012 SOUTH 0 4 1
PROCESS TIME EXTENSION FOR COMPLETION OF SUBDIVISION 12600 ARUNDEL WOODS PUD 10/31/2012 A 11/7/2012 SOUTH 0 4 1
PROCESS TIME EXTENSION FOR COMPLETION OF SUBDIVISION 12671 ARUNDEL WOODS PUD 12/18/2012 A 12/19/2012 SOUTH 0 4 1
PROCESS
ENVIRONMENTAL
NON-TIDAL WETLANDS & BUFFERS; 50' STREAM BUFFER' COMMUNITY MEETING REQ 11238 ARUNDEL WOODS, PUD 7/22/2010 A 5/16/2012 SOUTH 68 4 1
FP DISTURBANCE F10-010 ARUNDEL WOODS, PUD 7/22/2010 A 5/16/2012 SOUTH 68 4 1
PROCESS TIME EXT. APF 12234 ASCHERL/JAFFE 2/28/2012 A 3/21/2012 REGIONAL 0 4 4
PROCESS
ENVIRONMENTAL
STEEP SLOPES; COMMUNITY MEETING 12520 ATHLONE HILLS, LOT 1 WRENN PROPERTY 9/6/2012 A 9/26/2012 SOUTH 0 1 7
PROCESS
ENVIRONMENTAL
FOREST CONSERVATION; SPECIMEN TREE REMOVAL; SKIP SDP 12212 AUTO ZONE - GAMBRILLS 2/10/2012 A 7/30/2012 SOUTH 0 4 4
PROCESS TIME EXTENSION FOR RESUBMITTAL 12130 AUTOZONE- RITCHIE HEIGHTS 12/12/2011 A 1/4/2012 REGIONAL 1 5 1
PROCESS SKIP SDP 12447 AUTOZONE STORE #4660 - HANOVER 7/16/2012 A 9/12/2012 SOUTH 0 4 4
STANDARDS ROAD IMPROVEMENTS 12193 AVALON SHORES, LOTS 16-20, BLOCK 2, SECTION A 1/31/2012 A 2/29/2012 CRITICAL AREA 0 7 7
STANDARDS R/W ROAD FRONTAGE IMPROVEMENTS 12268 BACK BAY BEACH - LOTS 8 & 9 3/23/2012 A 4/18/2012 CRITICAL AREA 0 7 1
STANDARDS ROAD IMPROVEMENTS; WIDENING 12255 BACK BAY BEACH, LOT 7, BK 2 3/14/2012 A 4/11/2012 CRITICAL AREA 1 69 7
STANDARDS RIGHT OF WAY& PAVEMENT WIDTH IMPROVEMENTS 12476 BARBARA HEIGHTS, LOT 63 8/9/2012 A 9/12/2012 NORTH 0 3 3
PROCESS TIME EXTENSION 12371 BAYHEAD FARMS 6/1/2012 A 6/20/2012 NORTH 17 3 5
STANDARDS ROAD WIDENING 12287 BAYSIDE BEACH, LOT 9, SECT. D, PLAT 2 4/3/2012 A 5/2/2012 CRITICAL AREA 0 3 3
PROCESS
STANDARDS
SKIP SDP; LANDSCAPE 12625 BAYSIDE PEDIATRICS, 2566 RIVA RD 11/14/2012 A 12/5/2012 REGIONAL 0 2 6
PROCESS COMMUNITY MEETING REQUIREMENTS 12307 BEALL FARM 4/20/2012 A 6/6/2012 SOUTH 0 1 7
PROCESS SKIP SDP 12157 BEALL PROPERTY 1/4/2012 A 2/1/2012 REGIONAL 2 4 0
STANDARDS RD IMPVTS, ADEQUACY OF FACILITIES RDS 12427 BEECHWOOD O/T BURLEY, LOT 103 7/3/2012 A 8/22/2012 NORTH 0 3 5
PROCESS
ENVIRONMENTAL
NON-TIDAL WETLANDS&STREAM BUFFERS; COMMUNITY MEETNIG 12191A BELVEDERE BEACH/HARMONY POINT, LOT 130 6/20/2012 A 7/11/2012 CRITICAL AREA 0 3 5
PROCESS SKIP SDP 12223 BENNETT'S CURSE 2/21/2012 A 3/7/2012 SOUTH 0 4 1
PROCESS; ENVIRONMENTAL AMENDED PLAT; FOREST STAND DELINEATION & FOREST CONSERVATION PLAN 12308A BG&E/BRANDON SHORES- WAGNER SUBSTN 6/4/2012 A 6/13/2012 REGIONAL 0 3 3
STANDARDS TO INCLUDE LANDSCAPE MANUAL 12492AA BLOSSOM HILLS, LOT 11 & 12, BLK C/SMO, INC. 11/14/2012 A 12/12/2012 NORTH 0 1 3
PROCESS PRELIMINARY PLAN; COMMUNITY MEETING 12128 BLOSSOM HILLS, LTS 11, 12 BLK C PL 1/ SMO, INC GAS STATION 12/9/2011 A 2/8/2012 LAA 0 3 3
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 11684 BODKIN PLAINS, LOT 142 3/30/2011 A 2/8/2012 NORTH 0 3 3
PROCESS TIME EXTENSION 12393 BOHAGER PROPERTY 6/14/2012 A 7/11/2012 NORTH 164 3 3
STANDARDS ROAD IMPROVEMENTS 11566 BOULEVARD PARK LOT 33 2/4/2011 A 6/27/2012 CRITICAL AREA 0 3 3
PROCESS SKIP SDP; MODIFICATION APPLICATION FEE; COMMUNITY MEETING 12518 BOULEVARD PARK, LOTS 1-10 & 33-37 and LOTS 1-7 9/5/2012 A 9/12/2012 CRITICAL AREA 2 3 3
FP DEVELOPMENT IN FP F12-006 BOYERS RIDGE 4/26/2012 A 6/13/2012 SOUTH 224 4 1
PROCESS SKIP SKETCH 11739 BOYER'S RIDGE 5/6/2011 A 1/24/2012 SOUTH 0 4 1
STANDARDS ROAD DESIGN MANUAL 12318AA BOYER'S RIDGE 10/17/2012 A 11/7/2012 SOUTH 0 4 1
PROCESS
ENVIRONMENTAL
FOREST CONSERVATION REQUIREMENTS; FEE-IN-LIEU 12143 BRANDON WOODS BUS. PK., LOT 19RR 12/20/2011 A 2/22/2012 NORTH 0 3 3
STANDARDS
ENVIRONMENTAL
OS & REC AREA; SPECIMEN TREE REMOVAL; FOREST CONSERVATION REQUIREMENTS 11925 BRIGHTVIEW OF SEVERNA PARK 8/18/2011 A 1/25/2012 NORTH 154 3 5
PROCESS TIME EXTENSION 12472 BROADSTONE AT ODENTON 8/8/2012 A 8/22/2012 SOUTH 3 4 4
PROCESS SKIP SKETCH 12568 BROADSTONE AT ODENTON 10/4/2012 A 11/1/2012 REGIONAL 0 4 4
STANDARDS DESIGN MANUAL 12489A BROOKFIELD ON THE MAGOTHY 328 OAKDALE RD 9/24/2012 A 10/24/2012 CRITICAL AREA 0 3 3
PROCESS TIME EXTENSION 12137 BROOKLYN PARK GAS STATION 12/16/2011 A 1/18/2012 NORTH 0 5 1
PROCESS LANDSCAPE REDUCTION 12336 BROOKLYN PARK GAS STATION 5/8/2012 A 6/13/2012 NORTH 0 5 1
STANDARDS ROAD FRONTAGE IMPROVEMENTS; UTILITY EXTENSION 12564 BROOKLYN PARK, LOTS 15 ! 16, BLK V, SEC 1 10/3/2012 A 11/7/2012 NORTH 0 5 1
STANDARDS ROAD IMPROVEMENTS - PAVEMENT 12450 BROOKLYN PARK, LOTS 15-18, BLOCK Y 7/18/2012 A 8/15/2012 NORTH 1 5 1
STANDARDS ROAD IMPVTS 12365 BROWN PROP. 4156 SANDS RD, HARWOOD 5/29/2012 A 6/20/2012 SOUTH 0 1 7
PROCESS; STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS; STEEP SLOPES AND BUFFERS; COMMUNITY MEETING 12129 BROWN PROPERTY 12/12/2011 A 2/15/2012   1 3 5
PROCESS SKIP SDP; COMMUNITY MEETING 11720 BRUMWELL MANOR, LOT 103 4/27/2011 A 2/15/2012 NORTH 0 3 3
 STANDARDS
ENVIRONMENTAL
FOREST CON REQUIREMENTS, FOREST CON FEE IN LIEU, OPEN SPACE/ REC AREA, LANDSCAPE MANUAL 12107A BURWOOD GARDENS 1/19/2012 A 1/25/2012 REGIONAL 0 5 1
STANDARDS R/W ROAD IMPROVEMENTS 12270 BUTLER PROERTY P/O LOT 7 3/23/2012 A 11/7/2012 SOUTH 0 2 6
PROCESS SUBDIVISION REQUIREMENTS - AMENDED PLAT; PRE-SUBMISSION COMMUNITY MEETING 12238 BUTLER PROPERTY (7626 POST ROAD) 3/1/2012 A 4/25/2012 SOUTH 0 4 1
SWM WAIVER PROCESS UNDER SWM REGS IN EFFECT PRIOR TO 5/4/09 W00120 BWI CORPORATE CENTER SOUTH 6/14/2011 A 10/31/2012   0 5 1
PROCESS SKIP SDP 12376 BWI TECHNOLOGY PARK LOT 3 6/5/2012 A 6/27/2012 JDT 0 5 1
PROCESS SKIP SDP 12282 BWI TECHNOLOGY PARK PHASE 2 4/2/2012 A 5/16/2012 REGIONAL 0 5 1
PROCESS TIME EXTENSION FOR RESUBMITTAL 12333 CAGER SUBDIVISION 5/7/2012 A 6/6/2012 NORTH 0 3 5
PROCESS COMMUNITY MEETING 12536 CALVIN'S RETREAT, LOTS 3R & 4 (AMENDED PLAT) 9/17/2012 A 10/12/2012 NORTH 0 3 4
PROCESS SKIP SDP 11976 CANTINA MAMMA LUCIA 9/14/2011 A 3/7/2012 NORTH 0 5 1
STANDARDS ROAD IMPROVEMENTS; ROW DEDICATION 12587 CAPE ARTHUR, LOT 83, SEC. 2 - 212 MCKINSEY ROAD 10/22/2012 A 11/20/2012 CRITICAL AREA 0 3 3
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 12170 CAPE ST CLAIRE LOT 30 BLK J PL 1 1/13/2012 A 2/22/2012 NORTH 0 3 5
ENVIRONMENTAL REC AREA & OPEN SPACE 12394 CAPE ST CLAIRE, LOT 34, BLK AW, PL 10 6/14/2012 A 9/19/2012 NORTH 0 3 5
STANDARDS DESIGN MANUAL-ROAD IMPVTS 12172 CAPE ST. CLAIRE, LOTS 12&13, BLOCK AV, PLAT 10 1/17/2012 A 2/29/2012 NORTH 0 3 5
PROCESS SKIP PRELIMINARY &  SDP 12125 CARDER PROPERTY, LOT 3 12/9/2011 A 1/25/2012   0 5 1
STANDARDS ROAD IMPROVEMENTS 12607 CAREY PROPERTY, LOT 1B - 353A WASHINGTON AVE, GLEN BURNIE 11/5/2012 A 12/12/2012 NORTH 0 3 3
PROCESS SKIP SDP 12560 CARIBOU COFFEE 10/1/2012 A 10/17/2012 REGIONAL 0 2 6
PROCESS
ENVIRONMENTAL
STEEP SLOPES BUFFER; COMMUNITY MEETING 12542 CARROLLTON MANOR, LOT 44 9/20/2012 A 10/17/2012 CRITICAL AREA 0 3 5
STANDARDS RR/W & PAVING IMPROVEMENTS 12361 CARROLLTON MANOR, LOTS 28-30, BLOCK 9 5/24/2012 A 7/3/2012 CRITICAL AREA 0 3 5
PROCESS SITE DEVELOPMENT REVIEW FEES 12256 CASTLE & COOKE COLD STORAGE 3/15/2012 A 4/11/2012 REGIONAL   5 3
PROCESS
STANDARDS
ENVIRONMENTAL
ROAD IMPVMTS; OS; REC AREA; SKIP PRELIM PLAN 12340 CASTRUCCIO PROPERTY 5/10/2012 A 7/3/2012 CRITICAL AREA 1 3 3
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 12108 CATTAIL CONSTRUCTION CO. PROPERTY 11/30/2011 A 1/12/2012 CRITICAL AREA 0 3 3
STANDARDS ROW ROAD WIDENING / CLEAR SIGHT TRIANGLE 12183 CEBOLLERO PROPERTY 1/26/2012 A 2/22/2012 NORTH 0 3 5
PROCESS TIME EXTENSION 12383 CEDAR HILL PUD 6/8/2012 A 7/11/2012 LAA 0 5 1
PROCESS TIME EXTENSION FOR FINAL COMPLETION 12656 CEDAR HILL PUD, PHASE 1 12/7/2012 A 12/19/2012 NORTH 0 5 1
PROCESS TIME EXTENSION FOR FINAL COMPLETION 12657 CEDAR HILL PUD, PHASE 2 12/7/2012 A 12/19/2012 NORTH 0 5 1
PROCESS TIME EXTENSION 12381 CEDAR HILL PUD, PHASE I 6/8/2012 A 7/11/2012 LAA 0 5 1
PROCESS TIME EXTENSION 12384 CEDAR HILL PUD, PHASE II 6/8/2012 A 7/11/2012 LAA 0 5 1
ENVIRONMENTAL FOREST CONSERVATION 12138 CENTRAL ATLANTIC TOYOTA 12/16/2011 A 1/18/2012 NORTH 0 5 1
STANDARDS LANDSDCAPE MANUAL 12248 CENTRAL ATLANTIC TOYOTA 3/7/2012 A 4/25/2012 NORTH 0 5 1
PROCESS TIME EXTENSION -APF AND RESUBMITTAL 12352 CENTRALIA, LOT 10-16 5/21/2012 A 6/20/2012 SOUTH 0 4 1
STANDARDS ROAD FRONTAGE IMPROVEMENTS 12524 CHAMPION FOREST, LOT 86L 9/20/2012 A 10/12/2012 SOUTH 0 1 1
PROCESS
ENVIRONMENTAL
AMENDED PLAT PROCESS; FOREST CONSERVATION 12569 CHAPMAN PROPERTY, LOT 5R - 2516 CHAPMAN LANE 10/4/2012 A 10/17/2012 SOUTH 0 1 7
STANDARDS CUL-DE-SAC & PAVEMENT WIDTH 12533 CHATHAM HILLS, LOT 9 9/14/2012 A 10/17/2012 NORTH 0 3 5
STANDARDS ROAD IMPROVEMENTS; WATER EXTENSION; STREET TREES 12473 CHELSEA BEACH LOTS 251-260, & 359 8/8/2012 A 11/20/2012 NORTH 5 3 3
PROCESS
STANDARDS
R-O-W ROAD FRONTAGE IMPROVEMENTS; COMMUNITY MEETING 12088 CHERRY BLOSSOM 11/16/2011 A 2/1/2012 SOUTH 8 7 5
PROCESS, STANDARDS SDP, FCE REQUIREMENTS, LANDSCAPE MANUAL 12068 CHESAPEAKE SCIENCE POINT PUBLIC CHARTER SCHOOL 11/4/2011 A 1/4/2012 NORTH 0 5 1
PROCESS SKIP SDP; PRE-SUBMISSION COMMUNITY MEETING 12178 CHICK-FIL-A - 7055 ARUNDEL MILLS CIR 1/20/2012 A 2/29/2012 SOUTH 0 4 1
PROCESS SKIP SDP; PRE-SUBMISSION COMMUNITY MEETING 12123R CHICK-FIL-A - GLEN BURNIE 1/20/2012 A 3/22/2012 NORTH 0 5 1
PROCESS SKIP SDP; PRESUBMISSION COMMUNITY MEETING 11803A CHICK-FIL-A - WAUGH CHAPEL 1/25/2012 A 1/25/2012 SOUTH 0 2 4
PROCESS
STANDARDS
LANDSCAPE PLAN; ADEQUATE ROAD FACILITIES 12334 CHICK-FIL-A (SEVERNA PARK) 5/7/2012 A 6/27/2012 REGIONAL 0 1 5
ENVIRONMENTAL LANDSCAPE 12571AA CHICK-FIL-A (SEVERNA PARK) 11/19/2012 A 11/20/2012 REGIONAL 0 1 5
PROCESS SKIP SDP 12189 CHICK-FIL-A QUARTERFIELD CROSSING 1/30/2012 A 3/21/2012 SOUTH 0 4 2
PROCESS SKIP SDP; PRE-SUBMISSION COMMUNITY MEETING 12123 CHIK FIL A - GLEN BURNIE 12/8/2011 A 1/4/2012 NORTH 0 5 1
PROCESS REDUCE SDP SUBITTAL FEES; FEE-IN-LIEU FOR FOREST CONSERVATION 12204 CHIPOTLE MEXICAN GRILL #1825 2/7/2012 A 2/29/2012 REGIONAL 0 5 1
PROCESS TIME EXTENSION 12448 CHRISTOPHER A. MAIO, LOT 6 & OPEN SPACE 7/17/2012 A 8/12/2012 CRITICAL AREA 0 2 7
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS; STEEP SLOPES; COMMUNITY MEETING 12146 CHRISTY DAVIS PROPERTY 12/20/2011 A 1/25/2012 CRITICAL AREA 1 3 5
PROCESS
ENVIRONMENTAL
STREAMS & BUFFER DIST; STEEP SLOPES & BUFFER DIST; FOREST CONSERVATION; WETLANDS & BUFFER DIST; APPLICATION & STORM DRAIN FEES; PUBLIC MEETING REQ 12186 CHURCH CREEK HEADWATERS 1/26/2012 A 7/18/2012 CRITICAL AREA 0 2 6
FP
PROCESS
FLOODPLAIN DISTURBANCE; APPLICATION FEE F12-001 CHURCH CREEK HEADWATERS 1/26/2012 A 7/18/2012 CRITICAL AREA 0 2 6
PROCESS SKIP SDP 12415 CINGULAR WIRELESS - JEROME 6/25/2012 A 8/1/2012 CRITICAL AREA 0 3 5
PROCESS
ENVIRONMENTAL
SKIP SDP; SPECIMEN TREE REMOVAL; COMMUNITY MEETING 12280 CITY OF ANNAPOLIS WATER TREATMENT PLANT 3/30/2012 A 5/23/2012 SOUTH 0 2 6
PROCESS WAIVE DASH-1 SUBMITTAL FEE 12459 CLARKS LANDING AT SHADY SIDE 7/26/2012 A 8/15/2012 CRITICAL AREA 0 7 7
PROCESS SKIP SUBDIVISION& COMMUNITY MEETING 12324 CLEARWATER BEACH, PARTS OF LOTS 271-275 5/1/2012 A 6/13/2012 CRITICAL AREA 0 3 3
PROCESS
STANDARDS
PROCESS AS AMENDED PLAT; RD IMPROVEMENTS 11711 CLOVERFIELD ESTATES 4/20/2011 A 8/15/2012 SOUTH 0 8 7
STANDARDS RD IMPVTS-MAX CURVATURE&MIN RADIUS 11234AA COLDSPRING RUN 8/7/2012 A 10/12/2012 NORTH 0 3 3
PROCESS TIME EXTENSION FOR COMPLETION OF SUBDIVISION 12437 COVINGTON PROPERTY 7/11/2012 A 7/18/2012 SOUTH 0 1 7
PROCESS TIME EXTENSION 12254 CREEKSIDE 3/14/2012 A 3/28/2012 CRITICAL AREA 0 7 7
PROCESS AMENDED PLAT REQUIREMENTS 12455 CREEKSIDE AT OSPREY LANDING 7/23/2012 A 8/15/2012 CRITICAL AREA 0 3 3
PROCESS AMENDED PLAT PROCESS 12439 CREEKSTONE VILLAGE (AMENDED) 7/12/2012 A 9/5/2012 NORTH 0 3 3
STANDARDS DESIGN MANUAL 11666A CREEKSTONE VILLAGE, SECTION 1 6/27/2012 A 12/5/2012 NORTH 283 3 3
PROCESS TIME EXTENSION FOR RESUBMITTAL 12551 CREEKSTONE VILLAGE, SECTION 2 9/26/2012 A 10/24/2012 NORTH 0 3 3
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 12109 CREIGHTON PROPERTY 11/30/2011 A 1/4/2012 CRITICAL AREA 0 1 7
PROCESS SKIP PRELIMINARY PLAN; SKIP SDP 12591 CROMWELL BUSINES PARK, AREA 2 10/23/2012 A 11/20/2012 REGIONAL 0 5 3
ENVIRONMENTAL REC AREA REQUIREMENTS; CLEARING BELOW FOREST CON THRESHOLD 10476A CROMWELL PROPERTY 10/25/2010 A 12/5/2012 NORTH 0 3 3
PROCESS SKIP PP & SDP 12402 CURTIS BAY, LOT 1-95 STAHL POINT RD 6/19/2012 A 8/1/2012 REGIONAL 0 5 1
STANDARDS LANDSCAPE BUFFERS 12252 CURTIS COMMERCE CENTER 3/12/2012 A 5/23/2012 NORTH 9 5 1
PROCESS SKIP SDP 12506 CURTIS COMMERCE CENTER LOT 1 8/27/2012 A 10/3/2012 NORTH 0 5 1
PROCESS SKIP SDP 12295 CVS-ODENTON GATEWAY, LOT 4 4/16/2012 A 4/25/2012 REGIONAL 0 4 4
STANDARDS LANDSCAPE MANUAL REQUIREMENTS 12230 DERSLEY DEVELOPMENT 2/24/2012 A 4/12/2012 SOUTH 1 7 7
PROCESS TIME EXTENSION FOR RESUBMITTAL 12154 DITCHDALE 1/3/2012 A 1/25/2012 NORTH 3 5 5
PROCESS; STANDARDS SKIP SUBDIVISION; ROW ROAD FRONTAGE IMPROVEMENTS; OPEN SPACE AND REC AREA 12514 DONACHY, JENNY & WALTER PROPERTY 8/30/2012 A 10/12/2012 NORTH 0 3 3
PROCESS SKIP SDP 12301 DUNKIN DONUTS-5601 RITCHIE HIGHWAY 4/18/2012 A 7/11/2012 NORTH 0 5 1
PROCESS SKIP SDP; COMMUNITY MEETING 12200 EAGLES PASSAGE 2/6/2012 A 2/29/2012 SOUTH 0 2 7
ENVIRONMENTAL WETLANDS & BUFFER DISTURBANCE 12161 EAST GLEN BURNIE, RR PT LOTS 33-34 1/6/2012 A 3/7/2012 NORTH 5 2 0
PROCESS PLAT REQUIREMENTS; MODIFICATION FEE 12354 EDMONDS, ALONZO 5/22/2012 A 5/30/2012 SOUTH 0 2 7
PROCESS
STANDARDS
SKIP SDP; COMMUNITY MEETING; ROAD IMPROVEMENTS 12538 EIGHTEEN SEVENTY FIVE (1875) MAYFIELD RD 9/19/2012 A 11/1/2012 REGIONAL 0 4 4
PROCESS TIME EXTENSION FOR RESUBMITTAL 12584 ELDRIDGE PROPERTY 10/17/2012 A 11/15/2012 SOUTH 0 4 1
STANDARDS ROAD IMPROVEMENTS & R/W DEDICAITON 12386 ELIZABETH PLACE 6/11/2012 A 11/20/2012 NORTH 0 3 3
PROCESS TIME EXTENSION 12512 ELKS LANDING 8/29/2012 A 9/19/2012 CRITICAL AREA 23 7 7
PROCESS TIME EXTENSION 12375 ELK'S LANDING 6/4/2012 A 7/18/2012 TFB 25 7 7
PROCESS TIME EXTENSION FOR RESUBMITTAL 12241 ELVATON HEIGHTS, LOTS 30 & 31 "COUNTRY CRITTERS" 3/2/2012 A 3/22/2012 NORTH 0 3 3
STANDARDS SKIP REQUIRED MOD FEE; SKIP RESUBMITTAL FEE FOR -1 12366 EPPING FARM, LOT 6A & 6B 5/30/2012 A 7/18/2012 CRITICAL AREA 1 2 3
PROCESS
STANDARDS ENVIRONMENTAL
ROAD IMPROVEMENTS & ROAD WIDENING, STEEP SLOPES, COMMUNITY MEETING 12500 EPPING FOREST, LOT 4R 8/23/2012 A 9/26/2012 CRITICAL AREA 0 2 6
PROCESS TIME EXTENSION 12435 FERNDALE HILL 7/10/2012 A 8/12/2012 NORTH 6 5 1
STANDARDS ROAD IMPROVEMENTS 12175 FERNDALE HILLTOP LOTS 8 TO 11 1/18/2012 A 2/29/2012 NORTH 0 5 1
ENVIRONMENTAL FOREST CONSERVATION REQUIREMENTS 12179 FESTIVAL @ PASADENA 1/20/2012 A 2/1/2012 REGIONAL 0 1 3
PROCESS REDUCE SUBMITTAL FEE; SKIP SDP 12110 FESTIVAL AT PASADENA 12/1/2011 A 2/1/2012 NORTH 0 3 3
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12132 FIELDSTONE 12/13/2011 A 6/20/2012 TFB 181 4 4
PROCESS TIME EXTENSION FOR RESUBMISSION 12566 FIELDSTONE PRESERVE 10/4/2012 A 10/12/2012 SOUTH 0 4 4
PROCESS
ENVIRONMENTAL
CLEARING BELOW CONSERVATION THRESHOLD; FEE-IN-LIEU 12593 FLANIGAN PROPERTY 10/24/2012 A 11/20/2012 CRITICAL AREA 0 3 3
PROCESS ALLOW SUBDIVISION BY DEED 12405 FORD PROPERTY 6/20/2012 A 7/30/2012 SOUTH 0 1 7
PROCESS PRE-SUBMITTAL COMMUNITY MEETING 12148 FORD, JAMES PROPERTY 12/22/2011 A 2/22/2012 SOUTH 2 1 7
PROCESS TIME EXT FOR APF 12527 FORD, JAMES PROPERTY 9/11/2012 A 9/26/2012 SOUTH 0 1 7
STANDARDS ROAD FRONTAGE IMPROVEMENTS; REC AREA 12350 FORTY EIGHT TWENTY ONE (4821) IDLEWILDE ROAD 5/18/2012 A 7/18/2012 CRITICAL AREA 2 7 7
PROCESS TIME EXTENTION FOR COMMUNITY MEETING 12482 FORTY EIGHT TWENTY ONE (4821) IDLEWILDE ROAD 8/14/2012 A 9/12/2012 CRITICAL AREA 0 7 7
STANDARDS MODIFICATION FEE; LANDSCAPE BOND 12373 FREETOWN COMMUNITY IMPROVEMENT ASSOCIATION 6/1/2012 A 6/6/2012 NORTH 0 3 3
PROCESS
ENVIRONMENTAL
SLOPE/BUFFERS & COMMUNITY MEETING 12253 FUNKHOUSER PROPERTY, LOT 4 3/13/2012 A 4/18/2012 CRITICAL AREA 0 3 5
PROCESS SKIP SKETCH 12118 GARRENS CHOICE/ GARRISON MANOR 12/6/2011 A 2/29/2012 SOUTH 0 4 2
PROCESS SKIP SDP 12349 GENESIS KNOLLWOOD NURSING HOME FACILITY 5/18/2012 A 6/20/2012 SOUTH 1 4 7
PROCESS
ENVIRONMENTAL
DISTURBANCE OF WETLANDS BUFFERS; DISTURBANCE OF STEEP SLOPES; COMMUNITY MEETING 12105 GIBSON ISLAND LOTS 134 & 135 11/29/2011 A 5/30/2012 NORTH 0 3 3
PROCESS
STANDARDS
ENVIRONMENTAL
STEEP SLOPES, ROW & ROAD IMPROVEMENTS; COMMUNITY MEETING 12585 GIBSON ISLAND, LOT 237 - 724 SKYWATER ROAD 10/17/2012 A 11/7/2012 CRITICAL AREA 0 3 3
PROCESS SKIP SDP; SKIP PRE-SUBMISSION COMMUNITY MEETING 11673 GINGERVILLE YACHTING CENTER 3/28/2011 A 9/12/2012 CRITICAL AREA 0 2 6
PROCESS
STANDARDS
ENVIRONMENTAL
STEEP SLOPES; ROAD IMPROVEMENTS; COMMUNITY MEETING 12548 GLEBE HEIGHTS, LOT 14-16 9/21/2012 A 10/17/2012 CRITICAL AREA 0 1 7
STANDARDS REC AREA 12417 GLEN BRANCH, PAR 1028R (1541 BROOKHILL TERRACE) 6/27/2012 A 11/15/2012 NORTH 4 5 1
PROCESS ALLOW TO BE PROCESSED AS A MINOR 12250 GLEN EDEN, LOT 34 3/7/2012 A 3/28/2012 NORTH 0 3 5
STANDARDS 3:1 LOT RATIO,FLAG LOTS,OPEN SPACE & REC AREA, ROAD IMPVTS 12389 GLEN EDEN, LOT 34, RESERVE PARCEL 6/12/2012 A 8/1/2012 NORTH 1 3 5
STANDARDS LANDSCAPE MANUAL 12013A GLEN LAUNDROMAT 3/29/2012 A 4/25/2012 REGIONAL 0 5 2
PROCESS TIME EXTENSION 12461 GLEN OAK HEIGHTS LOT 27 P/O BK M 7/27/2012 A 8/22/2012 NORTH 6 5 2
PROCESS TIME EXTENSION TO APF 12541 GOTUGO PROPERTY 9/20/2012 A 10/17/2012 NORTH 0 3 3
PROCESS TIME EXTENSION FOR APF 12640 GOTUGO PROPERTY 11/21/2012 A 12/19/2012 NORTH 0 3 3
PROCESS SKIP AMENDED PLAT 12174 GOVERNOR BRIDGE ESTATES, LOT 10, SECTION 1 1/17/2012 A 2/29/2012 SOUTH 0 2 7
PROCESS SKIP AMENDED PLAT PROCESS 12327 GREAT MEADOW, LOT 4 5/3/2012 A 6/13/2012 NORTH 0 3 5
PROCESS TIME EXTENSION 12391 GREEN GABLES LOT 12R BLK C 6/14/2012 A 7/11/2012 NORTH 0 3 3
PROCESS TIME EXTENSION 12485 GREEN GABLES, BLOCK C, LOT 12 R / HERTOK PROPERTY 8/15/2012 A 9/12/2012 NORTH 0 3 3
PROCESS, STANDARDS, ENVIRONMENTAL STREAMS, ROAD IMPROVMENTS, R/W DEDICAITON AND SDP 12387 GREEN HAVEN - 211TH. STREET 6/11/2012 A 9/19/2012 NORTH 0 3 3
PROCESS; STANDARDS ALLOW TO BE PROCESSSED AS AN AMENDED PLAT; R-O-W ROAD IMPROVEMENTS 12074 GREEN HAVEN LOTS 16-19 11/7/2011 A 1/11/2012 NORTH 0 3 4
PROCESS
STANDARDS
ROAD FRONTAGE IMPROVEMENTS; SKIP SDP 12580 GREEN HAVEN, ARMIGER ADDTN, LOTS 10-13 10/11/2012 A 11/20/2012 CRITICAL AREA 0 3 3
STANDARDS RIGHT OF WAY IMPROVEMENTS 12622 GREEN HAVEN, LOTS 11 & 12, SEC 6 11/13/2012 A 12/5/2012 CRITICAL AREA 0 3 3
STANDARDS ROW IMPVTS& WIDENING 12224 GREEN HAVEN, LTS 28, 29, SECT 69 2/21/2012 A 4/12/2012 CRITICAL AREA 0 3 3
PROCESS
STANDARDS
ENVIRONMENTAL
REFORESTATION FEE-IN-LIEU; SPECIMEN TREES; WETLANDS & BUFFER DIST; REC AREA; ROAD IMPROVEMENTS 12019A GREGOR/KIM PROPERTY 6/6/2012 A 8/15/2012   0 4 1
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12117 GROSE PROPERTY 12/6/2011 A 1/4/2012 SOUTH 0 1 7
PROCESS SDP & COMM MTG 12244 GUY C. PARLETT AMERICAN LEGION POST 7 3/6/2012 A 4/4/2012 SOUTH 0 2 6
PROCESS SHEET SIZE 12115 HACKMANN PROPERTY 12/5/2011 A 2/1/2012 NORTH 101 3 3
PROCESS COMMUNITY MEETING 12575 HACKMANN PROPERTY 10/5/2012 A 11/15/2012 NORTH 0 3 3
STANDARDS ROAD IMPROVEMENTS;RECREATION REQUIREMENTS; LANDSCAPE BUFFERS, FORSETS CONSERVATION: SPECIMEN TREES; THRESHOLD; OFFSITE PLANTING OR FEE-IN-LIEU 12276A HACKMANN PROPERTY 7/27/2012 A 11/20/2012 SOUTH 108 3 3
ENVIRONMENTAL WETLANDS & BUFFERS; STEE SLOPES & BUFFERS 12209 HAMMONDS CONNECTION AT THE DAIRY FARM - PHASE 1 2/10/2012 A 3/22/2012 SOUTH 0 4 4
STANDARDS
ENVIRONMENTAL
R-O-W ROAD FRONTAGE IMPROVEMENTS; STEEP SLOPES & BUFFERS 11989 HERALD HARBOR - LOTS 40-48, BLK 109 - ALDER TRAIL 9/23/2011 A 3/7/2012 SOUTH 2 2 4
STANDARDS ROAD DESIGN 11989R HERALD HARBOR - LOTS 40-48, BLK 109 - ALDER TRAIL 5/30/2012 A 6/13/2012 SOUTH 2 2 4
STANDARDS/ ENVIRONMENTAL R/W ROAD IMPROVEMENTS/ & PAVEMENT/ PSCM/ UTILITY EXT. 12367A HERALD HARBOR LOTS 14-27 BLOCK 75 7/25/2012 A 8/22/2012 CRITICAL AREA 0 0 0
PROCESS SDKIP PRELIMINARY; PRE-SUBMISSION COMMUNITY MEETING 11989A HERALD HARBOR ON THE SEVERN, SEC E, BLK 109, LOTS 40-48 2/9/2012 A 4/12/2012   0 2 4
PROCESS TIME EXTENSION FOR RESUBMITTAL 12322 HERALD HARBOR SECTION E BLOCKS 95-96 4/30/2012 A 5/23/2012 CRITICAL AREA 0 2 4
PROCESS
STANDARDS
ENVIRONMENTAL
ROW & PAVEMENT IMPROVEMENTS; STEEP SLOPES; COMMUNITY MEETING 12602 HERALD HARBOR, LOT 17, SEC C, BLK 59 - 328 SEVERN ROAD 10/31/2012 A 11/28/2012 CRITICAL AREA 0 2 4
STANDARDS RIGHT OF WAY & PAVEMENT IMPROVEMENTS 12532 HERALD HARBOR, LOT 22 9/14/2012 A 10/12/2012 CRITICAL AREA 0 2 4
PROCESS
STANDARDS
SKIP PRELIMINARY PLAN; ROAD IMPROVEMENTS 12582 HERALD HARBOR, LOT 9, SEC C, BLK 41, 846 DOGWOOD TRAIL 10/16/2012 A 10/17/2012 CRITICAL AREA 0 2 4
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 12159 HERALD HARBOR, LOTS 1-9 BK 150 SC D 1/5/2012 A 1/25/2012 SOUTH 2 4 0
PROCESS TIME EXTENSION FOR RESUBMITTAL 12610 HERALD HARBOR, SEC E, BLKS 95 & 96 (AMENDED PLAT) 11/5/2012 A 11/20/2012 CRITICAL AREA 0 2 4
PROCESSS
ENVIRONMENTAL
STEEP SLOPES; COMMUNITY MEETING 12076 HERITAGE HARBOUR COMMUNITY ASSOCIATION 11/8/2011 A 3/21/2012 SOUTH 1 2 6
PROCESS SKETCH 12429 HIDDEN CREEK 7/3/2012 A 8/15/2012 CRITICAL AREA 0 3 5
STANDARDS
ENVIROMENTAL
ROAD IMPROVEMENTS; OPEN SPACE & REC AREA; LOT RATIO; STREET TREES 12563 HIDDEN CREEK 10/2/2012 A 11/28/2012 CRITICAL AREA 0 3 5
PROCESS
ENVIRONMENTAL
STEEP SLOPES BUFFER DISTURBANCE; COMMUNITY MEETING 12164 HIGH BANK ON SEVERN LOT 2 - GARVEY PROPERTY 1/6/2012 A 7/18/2012 CRITICAL AREA 3 5 0
PROCESS TIME EXTENSION 12145 HIGHLAND MEADOWS 12/20/2011 A 1/4/2012 SOUTH 44 4 4
ENVIRONMENTAL SPECIMEN TREE REMOVAL 12528R HIGHLAND MEADOWS 9/12/2012 A 11/7/2012 SOUTH 0 4 4
PROCESS TIME EXTENSION FOR RESUBMITTAL 12188 HIGHLAND WOODS SECTION 2 1/30/2012 A 2/29/2012 NORTH 8 3 5
PROCESS SKIP SKETCH PLAN PROCESS 12388 HIGHLAND WOODS, SECTIONS TWO 6/11/2012 A 8/12/2012 NORTH 8 3 5
ENVIRONMENTAL NON-TIDAL WETLANDS; COMMUNITY MEETING 12173 HILLSMERE ESTATES LOT 5, BK Y, SECT. 3, PL 2 1/17/2012 A 6/13/2012 CRITICAL AREA 0 2 6
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12503 HILLSMERE ESTATES, LOT 35, BK A, SC 1 8/24/2012 A 9/19/2012 CRITICAL AREA 0 2 6
PROCESS SKIP SUBDIVISION; COMMUNITY MEETING 12085 HILLSMERE, Lot 139, 127 W. BAY VIEW DRIVE 11/15/2011 A 1/11/2012 CRITICAL AREA 2 6 0
PROCESS AMENDED PLAT; COMM. MTG.; WETLANDS DISTURBANCE; STREAM DISTURBANCE 11449A HOLT PROPERTY 2/11/2011 A 8/15/2012 SOUTH 0 1 7
FP DISTURBANCE OF FLOOD PLAIN F10-016 HOLT PROPERTY 12/2/2010 A 8/15/2012 NORTH 0 1 7
STANDARDS R/W ROAD IMPROVEMENTS 12271 HOMELAND PARK - WHITE FARM 3/23/2012 A 4/25/2012 SOUTH 0 5 1
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 12111 HUDSON PROPERTY 12/1/2011 A 1/4/2012 CRITICAL AREA 0 3 6
PROCESS TIME EXT. APF 12235 JAFFE-DORSEY ROAD 2/28/2012 A 4/11/2012 NORTH 0 5 1
PROCESS TIME EXTENSION FOR SDP & APF'S 12546 JAFFE-DORSEY ROAD 9/21/2012 A 10/17/2012 NORTH 0 5 1
PROCESS SKIP SDP 12588 JESUS HOUSE OF ELKRIDGE - 805 BARKWOOD CT, LINTHICUM 10/22/2012 A 11/20/2012 CRITICAL AREA 0 5 1
STANDARDS R/W & PAVING IMPROVEMENTS 12362 JOHNSON PROPETY, LOT 8 5/24/2012 A 8/1/2012 NORTH 0 3 5
SWM WAIVER PROCESS UNDER SWM REGULATIONS INEFFECT PRIOR TO 5/4/09 W00121 JOHNSON, ANNA PROPERTY 7/26/2011 A 2/15/2012 CRITICAL AREA 2 3 3
STANDARDS OPENS SPACE; RECREATION AREA; PUBLIC ROAD IMPVMTS 12341 JONES, ORION & SHARON PROPERTY 5/10/2012 A 6/27/2012 SOUTH 0 4 1
PROCESS TIME EXTENSION 12259 JOYCE LANE 3/16/2012 A 3/22/2012 NORTH 70 3 5
STANDARDS/ENVIRONMENTAL REC. AREA, SPECIMEN TREE REMOVAL/ WET-LAND /WETLAND BUFFER DIST. / 100-FOOT STREAM BUFFER/ STEEP SLOPE AND THEIR BUFFERS 12001AA JOYCE LANE 8/16/2012 A 10/3/2012 NORTH 0 3 5
FP DISTURBANCE TO FP F11-013A JOYCE LANE 8/16/2012 A 10/3/2012 NORTH   3 5
PROCESS SKIP SKETCH 12166 KAPLANS PURCHASE 1/6/2012 A 3/7/2012 SOUTH 2 1 36
PROCESS TIME EXTENSION FOR RESUBMITTAL 12535 KHI / BROCK BRIDGE LLC PROPERTY 9/17/2012 A 9/26/2012 SOUTH 0 4 4
PROCESS TIME EXTENSION 12258 KHI/BROCK BRIDGE LLC PROPERTY 3/16/2012 A 3/21/2012 SOUTH 116 4 4
PROCESS TIME EXTENSION 12347 KHI/BROCK BRIDGE LLC PROPERTY 5/18/2012 A 6/13/2012 SOUTH 116 4 4
PROCESS TIME EXTENSION FOR RESUBMITTAL 12446 KHI/BROCK BRIDGE LLC PROPERTY 7/16/2012 A 8/12/2012 SOUTH 116 4 4
PROCESS TIME EXTENSION 12222 KIDDIE ACADEMY DAYCARE 2/21/2012 A 3/14/2012 SOUTH 0 4 4
PROCESS COMMUNITY MEETING 12515 KIDDIE ACADEMY DAYCARE 8/30/2012 A 9/26/2012 REGIONAL 0 4 4
STANDARDS; PROCESS; ENVIRONMENTAL SPECIMEN TREE REMOVAL; AFFORESTATION/FORESTATION; FORESTATION FEE-IN-LIEU; LANDSCAPE REQUIREMENTS; BUFFER REQUIREMENTS;SEWER EXTENSION 11948A KIDDIE ACADEMY OF ARNOLD 10/24/2011 A 2/8/2012 NORTH 0 2 7
PROCESS TIME EXTENSION FOR APF 12576 KIDDIE ACADEMY OF ARNOLD 10/8/2012 A 11/15/2012 NORTH 0 3 5
PROCESS TIME EXT 12407 KIDWELL PROPERTY & THE RESUBDIVISION @ LEE AIRPORT 6/21/2012 A 7/3/2012 CRITICAL AREA   1 7
PROCESS
STANDARDS
ROAD IMPROVEMENTS; MODIFICATION FEE 12639 KING, ALICE PROPERTY, RESIDUE OF 11/21/2012 A 12/12/2012 SOUTH 0 1 7
PROCESS, STANDARDS SKIP SDP, PARKING 12507 KINGDOM CELEBRATION CENTER DAYCARE 8/28/2012 A 9/19/2012 REGIONAL 0 4 4
STANDARDS ROAD IMPVTS 12245 KINGS HEIGHTS, LOT 1, BK B 3/6/2012 A 3/28/2012 REGIONAL 0 4 4
PROCESS SKIP PRELIMINARY PLAN; SKIP SDP 12561 KOREAN AMERICAN CHURCH OF PHILIPPI 10/2/2012 A 10/17/2012 REGIONAL 0 4 1
PROCESS SKIP SDP 12197 KRAZY OTTO'S SPORTS SALOON 2/2/2012 A 2/29/2012 SOUTH 0 2 7
SWM WAIVER PROCESS UNDER SWM REGULATIONS PRIOR TO 5/4/09 W00015 LAMON'S LANDING 6/28/2010 A 3/22/2012 CRITICAL AREA 0 3 5
STANDARDS,ENVIRONMENTAL FLOODPLAIN STUDY EXEMPTION& ROW WIDENING& FRONTAGE IMPVTS 12299 LANDWEHRS TRACT, LOT 19 4/18/2012 A 5/23/2012 SOUTH 0 4 4
PROCESS TIME EXTENSION 12022R LAUREL HEIGHTS SELF STORAGE 10/11/2011 A 2/1/2012 SOUTH 0 0 0
PROCESS TIME EXTENSION FOR RESUBMITTAL 12357 LAUREL RACE TRACK 5/23/2012 A 6/20/2012 SOUTH 0 0 0
PROCESS
STANDARDS
ENVIRONMENTAL
SPECIMEN TREES; R-O-W WIDTH; REDUCE SUBMITTAL FEES 12216 LDJ INVESTMENTS, LLC PROPERTY 2/16/2012 A 10/17/2012 SOUTH 0 4 4
PROCESS TIME EXTENSION 12486 LEE PROPERTY (PARCEL 255) RESIDUE PARCEL 8/15/2012 A 8/15/2012 REGIONAL 0 1 7
STANDARDS ROAD IMPROVEMENTS 12355 LENNOX PARK, LOT 107 5/22/2012 A 6/20/2012 SOUTH 0 4 1
PROCESS ALLOW A LANDLOCKED BULK PARCEL; MODIFICATION FEE 12586 LERCH PROPERTY 10/22/2012 A 10/24/2012 SOUTH 0 2 7
ENVIRONMENTAL WETLANDS &  BUFFER DISTURBANCE; SPECIMEN TREE REMOVAL; FOREST CONSERVATION REQUIREMENTS; STREAM BUFFER DISTURBANCE 11723 LIBERTY VALLEY 4/28/2011 A 5/30/2012 REGIONAL 3 4 4
FP NO DEVELOPMENT IN FLOODPLAIN; FLOODPLAIN REQUIREMENTS F12-007 LIBERTY VALLEY 5/2/2012 A 5/30/2012 REGIONAL 440 4 4
PROCESS
ENVIRONMENTAL
STEEP SLOPE & BUFFER DISTURBANCE; COMMUNITY MEETING 11813 LINSTEAD ON THE SEVERN, LOT 66 6/21/2011 A 1/4/2012 CRITICAL AREA 0 3 5
PROCESS
ENVIRONMENTAL
STEEP SLOPE DISTURBANCE; COMMUNITY MEETING 12171 LOCH HAVEN BEACH,  LOT 12 BLK L SEC 2 1/13/2012 A 2/8/2012 CRITICAL AREA 0 1 7
STANDARDS R-O-W ROAD IMPROVEMENTS 12423 LONG POINT, LOTS 3 & 4, SEC D 6/29/2012 A 8/1/2012 CRITICAL AREA 0 3 3
STANDARDS R/W & PAVING IMPROVEMENTS 12360 LONGVIEW ON THE MAGOTHY, LOT 6 5/24/2012 A 7/3/2012 CRITICAL AREA 0 3 5
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 12119 M DELMA MCCARTER EST LT 2/ SHOREHAM BEACH RD SUBD 12/7/2011 A 1/4/2012 CRITICAL AREA 16 1 7
PROCESS AMENDED RECORD PLAT 12264 MAGENAU, CMI ASSOC & JWL ASSOC PROPERTY, LOT 3B 3/21/2012 A 4/18/2012 SOUTH 0 74 7
PROCESS SHEET SIZE 12634 MAGNOLIA CREEK 11/16/2012 A 12/12/2012 NORTH 0 4 1
STANDARDS ROAD IMPROVEMENTS 12573 MAGOTHY MANOR, LOT C 10/4/2012 A 11/20/2012 NORTH 0 3 5
PROCESS TIME ETENSION 12141 MAIDSTONE TURNER FARM 12/19/2011 A 1/4/2012 SOUTH 9 8 7
PROCESS TIME EXTENSION FOR RESUBMITTAL 12438 MAIDSTONE TURNER FARM 7/11/2012 A 7/18/2012 SOUTH 0 8 7
PROCESS/ STANDARDS/ ENVIRONMENTAL RD IMPVTS, STREET TREES&LIGHTS, NTW BUFFERS,STREAM BUFFER 12337 MAIDSTONE TURNER FARM 5/8/2012 A 8/1/2012 SOUTH 0 8 7
SWM WAIVER PROCESS UNDER SWM REGULATIONS IN EFFECT PRIOR TO 5/4/09 W00101 MANGEE PROPERTY 3/11/2011 A 3/22/2012 SOUTH 5 5 2
STANDARDS/ ENVIRONMENTAL/ PROCESS R/W & PAVEMENT IMPROVEMENTS/ 25' STEEP SLOPE BUFFER DISTURBANCE, COMMUNITY MEETING 12363 MANHATTAN BEACH, LOTS 8 &9 5/24/2012 A 7/3/2012 CRITICAL AREA 0 3 5
STANDARDS DESIGN STANDARDS - ROAD FRONTAGE IMPROVEMENTS; STREET TREES; STREET LIGHTS; TRAFFIC SIGNS 12195 MANHATTAN MANOR - LOT 68 2/1/2012 A 2/29/2012 CRITICAL AREA 0 3 5
PROCESS TIME EXTENSION FOR SUBDIVISION COMPLETION 12534 MANHATTAN MANOR, RESUB LOTS 32 & 33 9/17/2012 A 9/19/2012 CRITICAL AREA 0 3 3
STANDARDS DESIGN MANUAL 12302A MARGATE, LOTS 338-340 / BENMERE ESTATES 4/18/2012 A 6/27/2012 CRITICAL AREA 4 5 2
SWM WAIVER PROCESS UNDER SWM REGS IN EFFECT PRIOR TO 5/4/09 W00129 MARLEY POINTE 5/22/2012 A 8/1/2012 NORTH 4 3 3
PROCESS TIME EXTENSION FOR RESUBMITTAL 12603 MARLEY POINTE 11/1/2012 A 11/28/2012 NORTH 0 3 2
STANDARDS OPEN SPACE & REC AREA; ROAD FRONTAGE IMPROVEMENTS 12067 MARSHALL, TIMOTHY PROPERTY 11/3/2011 A 1/4/2012 CRITICAL AREA 0 2 6
PROCESS AMENDED RECORD PLAT & PRE-SUB COMMUNITY MEETING 12181 MARYLAND LIVE CASINO 1/24/2012 A 2/1/2012 REGIONAL 0 4 1
STANDARDS RIGHT OF WAY & PAVEMENT WIDTH IMPROVEMENTS 12474 MAXIE BROOKS PROPERTY, LOT 52 8/9/2012 A 9/12/2012 NORTH 0 5 2
PROCESS WAIVE PROVISION FOR FAMILY CONVEYANCE 5 YEAR HOLD PROVISION 12142 MCBAIN/NASH PROPERTY 12/19/2011 A 1/4/2012 SOUTH 0 1 7
STANDARDS LANDSCAPE MANUAL 12351 MCDONALDS - 3382 LAUREL FT MEADE ROAD 5/18/2012 A 6/20/2012 SOUTH 0 4 4
PROCESS & STANDARDS SKIP SDP 12315 MCDONALDS - WHITE HALL RD 4/26/2012 A 5/30/2012 REGIONAL 0 3 5
PROCESS & STANDARDS SKIP SDP, ROAD DESIGN & LANDSCAPE MANUAL 12316 MCDONALDS 7960 B & A BLVD 4/26/2012 A 5/30/2012 REGIONAL 0 3 2
STANDARDS LANDSCAPE MANUAL; FOREST CONSERVATION 11482 MCDONALDS, 6902 & 6906 RITCHIE HIGHWAY 12/21/2010 A 2/29/2012 NORTH 0 5 1
PROCESS SKIP SDP 11279 MCDONALDS, DENERALS HWY 8/17/2010 A 2/22/2012 SOUTH 0 2 6
STANDARDS RIGHT-OF-WAY; RECREATION AND OPEN SPACE; PROCESS AS FINAL 11645R MCNAMARA FAMILY TRUST PROPERTY 6/25/2012 A 8/12/2012 CRITICAL AREA 8 3 3
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12081 MERCIER PROPERTY 11/14/2011 A 2/1/2012 NORTH 5 1 0
FLOODPLAIN ALLOW EXISTING IMPERVIOUS TO REMAIN F11-015 MERCIER PROPERTY 11/14/2011 A 2/1/2012 NORTH 5 1 0
FP FLOODPLAIN DISTURBANCE F09-013A MIKLASZ PROPERTY 8/3/2011 A 11/15/2012   251 4 1
STANDARDS
ENVIRONMENTAL
STEEP SLOPES & BUFF; WETLANDS & BUFF; STREAMS & BUFF; SPECIMEN TREES; TH UNITS ON PUBLIC STREETS; R-O-W DESIGN MANUAL; SIDEWALKS 10715AAA MIKLASZ PROPERTY 2/14/2012 A 11/15/2012 SOUTH 251 4 1
PROCESS TIME EXTENSION 12246 MILLHOUSE CREEK 3/6/2012 A 3/28/2012 NORTH 76 3 3
STANDARDS PRIVATE ROADS 12228 MILLHOUSE CREEK, SEC 2 2/23/2012 A 5/23/2012 NORTH 15 3 3
PROCESS TIME EXTENSION FOR COMPLETION OF SUBDIVISION 12335 MILLSTONE VILLAGE 5/8/2012 A 5/23/2012 SOUTH 0 4 4
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS 12133 MOELLER, WILLIAM & SHARON PROPERTY 12/14/2011 A 1/25/2012 VLC 0 3 5
PROCESS
ENVIRONMENTAL
STREAM BUFFER; WETLANDS & BUFFER; SPECIMEN TREES; DRIVE AISLE WIDTH; REFORESTATION FEE-IN-LIEU 12275 MONARCH ACADEMY 3/27/2012 A 12/12/2012 SOUTH 0 4 4
FP DISTURBANCE FOR UTILITY CONNECTION F12-005 MONARCH ACADEMY 3/27/2012 A 12/12/2012 SOUTH 0 4 4
STANDARDS OPEN SPACE & REC AREA; R-O-W ROAD FRONTAGE IMPROVEMENTS 12099 MOORE, DELBERT, JR. PROPERTY 11/22/2011 A 1/25/2012 SOUTH 2 41 2
PROCESS
STANDARDS
DESIGN MANUAL - STREET TREE, SIGNAGE, LIGHTS; MODIFICATION FEE 11867R MOORE, LEROY S. PROPERTY 8/10/2012 A 9/5/2012 NORTH 2 3 5
PROCESS
STANDARDS
ALLOW TO BE PROCESSED AS A MINOR; OS & REC AREA; DESIGN MANUAL ROW WIDTH 12441 MT PLEASANT BEACH LOTS 2 & 3 7/13/2012 A 9/12/2012 CRITICAL AREA 2 1 3
STANDARDS ROAD FRONTAGE IMPROVEMENTS 12565 MULLENAX PROPERTY, 199 MCQUAY RD 10/3/2012 A 11/7/2012 NORTH 0 3 5
STANDARDS MIXED USE PERCENTAGES 12194 National Business Park (All Phases) 2/1/2012 A 2/8/2012 REGIONAL 0 4 1
PROCESS TIME EXTENSION 12460 NATIONAL BUSINESS PARK NORTH, PH 2, SEC 1 7/26/2012 A 8/12/2012 REGIONAL 0 4 2
PROCESS TIME EXTENSON 12292 NATIONAL BUSINESS PARK NORTH, PHASE 2, SECTION 2 4/4/2012 A 4/11/2012 REGIONAL 0 4 1
ENVIRONMENTAL SPECIMEN TREE REMOVAL, CLEARING BELOW FOREST CONS. THRESHOLD, LANDSCAPE BUFFER DISTURBANCE 12293 NAVY FEDERAL CREDIT UNION 4/5/2012 A 5/16/2012 REGIONAL 0 2 6
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12445 NEAT PROPERTY, LOT 3 (AMENDED PLAT) 7/16/2012 A 9/19/2012 NORTH 0 3 5
STANDARDS
ENVIRONMENTAL
CONSERVATION THRESHOLD; 50' CLUSTER SETBACK; SPECIMEN TREES; PRIV RD WIDTH; PUB ROAD IMP; OS 12004A NICHOLS PROPERTY, RESUB, LOT 2 5/9/2012 A 7/18/2012 SOUTH 0 4 4
PROCESS R/W ROAD FRONTAGE IMPROVEMENTS (DESIGN MANUAL) 12257 NIXON, ROBERT & MICHELE PROPERTY 3/15/2012 A 5/16/2012 CRITICAL AREA 1 1 7
PROCESS
ENVIRONMENTAL
STEEP SLOPES; COMMUNITY MEETING 12599 NORTH SHORE, LOT 211 - 526 EDGEWATER RD 10/26/2012 A 11/20/2012 CRITICAL AREA 0 3 3
PROCESS ROADS IMPACT FEES 12378 NORTHROP GRUMMAN - SAF IV 6/5/2012 A 7/18/2012 CGW 13 5 1
STANDARDS RIGHT OF WAY & PAVEMENT IMPROVEMENTS 12329 OAK & HOLLY ROAD 5/4/2012 A 6/20/2012 NORTH 0 3 3
PROCESS TIME EXTENSION 12284 OAKVIEW VILLAGE 4/2/2012 A 4/18/2012 NORTH 116 3 2
PROCESS ENVIRONMENTAL STANDARDS SKIP SKETCH; PRIV R/W; SIDEWALKS; WETLAND & BUFF; REC AREA; REFORESTATION; PARKING; STREET TREES; CMTY MTG 12410 OAKWOOD FAMILY HOMES 6/21/2012 A 10/17/2012 NORTH 23 3 2
STANDARDS; ENVIRONMENTAL WETLAND BUFFER DISTURBANCE; SPECIMEN TREE REMOVAL; CLEARING BELOW THRESHOLD; RECREATION AREA 11452A OAKWOOD VILLAGE (FORMERLY OAKWOOD ASSEMBLAGE) 5/7/2012 A 12/12/2012 NORTH 116 3 2
PROCESS
ENVIRONMENTAL
COMMUNITY MEETING; SPECIMEN TREES; CLEARING BELOW THRESHOLD; NON-TIDAL WETLANDS; STREAM BUFFER; STEEP SLOPES 12279 ODENTON TOWN CENTER SEWER INTERCEPTOR 3/30/2012 A 4/18/2012 REGIONAL 0 4 2
PROCESS FOREGO AMENDED PLAT 12353 O'NEILL, MABEL/SPRINGER LOT 3-RESIDUE RESUB 5/21/2012 A 6/13/2012 SOUTH 7 8 7
STANDARDS RIGHT OF WAY & PAVEMENT WIDTH IMPROVEMENTS 12475 ORCHARD BEACH, LOTS 1-4 8/9/2012 A 9/12/2012 CRITICAL AREA 0 3 3
PROCESS SKIP SDP; RESUBMITTAL FEE FOR PRELIM PLAN 12199 ORPHAN GRAIN TRAIN 2/3/2012 A 6/25/2012 NORTH 0 3 5
PROCESS SKIP SDP; COMMUNITY MEETING 12442 OUR LADY OF THE FIELDS CATHOLIC CHURCH 7/13/2012 A 8/1/2012 SOUTH 0 4 4
PROCESS
ENVIRONMENTAL
STEEP SLOPES BUFFER; COMMUNITY MEETING 12579 PALISADES ON THE SEVERN, LOT 4, SEC J, BL 211, 506 WILSON RD 10/11/2012 A 11/7/2012 CRITICAL AREA 0 2 4
PROCESS SKIP SDP 12122 PANERA BREAD - VILLAGE AT WAUGH CHAPEL SOUTH 12/7/2011 A 1/18/2012 REGIONAL 0 4 4
STANDARDS FEE FOR SDP 12201 PARK 'N FLY BWI 2/6/2012 A 2/8/2012 REGIONAL 0 5 1
PROCESS
ENVIRONMENTAL
FOREST CONSERVATION THRESHOLD; REC AREA; SPECIMEN TREES; PLAN SUBMITTAL FEE 11742A PARKER, PAUL & TAYLOR, GRAYTON PROPERTY, LOTS 1 & 2 4/20/2012 A 7/11/2012 NORTH 73 3 2
PROCESS
ENVIRONMENTAL
SPECIMEN TREES; FOREST CON FEE-IN-LIEU; WETLANDS & BUFFER IMPACTS 11414A PARKSIDE (MIXED USE DEV) 2/22/2011 A 9/5/2012 REGIONAL 1144 4 1
FP FP IMPACTS F10-014A PARKSIDE (MIXED USE DEV) 2/22/2011 A 9/19/2012 REGIONAL 1144 4 1
PROCESS TIME EXTENSION FOR RESUBMITTAL 12398 PATEL INDUSTRIAL PARK 6/18/2012 A 6/27/2012 REGIONAL 1 4 4
PROCESS TIME EXTENSION TO RESUBMIT 12501 PATEL INDUSTRIAL PARK 8/23/2012 A 8/12/2012 REGIONAL   4 4
PROCESS TIME EXTENSION 12636 PATUXENT WOODS SOUTH 11/19/2012 A 12/5/2012 SOUTH 7 4 4
PROCESS TIME EXTENSION 12372 PENDENNIS GLEN (FORMERLY AYRSHIRE ESTATES) 6/1/2012 A 6/27/2012 NORTH 7 3 5
PROCESS TIME EXTENSION FOR RESUBMITTAL 12399 PENNUCCI PROPERTY 6/18/2012 A 6/27/2012 SOUTH 5 4 4
PROCESS TIME EXTENSION OF APF 12611 PERRY PROPERTY 11/5/2012 A 12/5/2012 SOUTH 0 4 2
PROCESS TIME EXT. FOR APF 12300 PERRY, THOMAS  PROPERTY 4/18/2012 A 5/9/2012 SOUTH 0 4 2
PROCESS TIME EXTENSION FOR APF 12416 PERRY, THOMAS PROPERTY 6/26/2012 A 6/25/2012 SOUTH 3 4 2
PROCESS TIME EXTENSION FOR APF 12504 PERRY, THOMAS PROPERTY 8/24/2012 A 9/5/2012 SOUTH 0 4 2
STANDARDS PAVEMENT WIDTH 12612 PHIPPS PROPERTY 11/5/2012 A 12/12/2012 SOUTH 0 1 7
PROCESS SKIP SDP 12139 PIER 7 MARINA PROPRETY 12/16/2011 A 1/18/2012 CRITICAL AREA 0 1 7
STANDARDS ROW DEDICATION; ROAD IMPROVEMENTS 12581 PINE HAVEN, LOT 13, BLK D, 7659 CEDAR DRIVE 10/12/2012 A 11/20/2012 CRITICAL AREA 0 3 3
PROCESS
STANDARDS
ENVIRONMENTAL
STEEP SLOPES & BUFFER; COMMUNITY MTG; ROAD IMPVMTS 12608 PINES ON SEVERN, LOTS 28-32 11/5/2012 A 12/5/2012 NORTH 0 3 5
PROCESS
ENVIRONMENTAL
STEEP SLOPES; COMMUNITY MEETING 12596 PINES ON SEVERN, LOTS 750, 751 & P/O 700 - 160 SEVERN WAY 10/24/2012 A 11/28/2012 CRITICAL AREA 0 3 5
PROCESS PRELIMINARY PLAN; ALLOW FINAL TO BE REINSTATED 12278 PINEY HILL 3/30/2012 A 4/18/2012 SOUTH 2 4 1
PROCESS SKIP SKETCH / CONSOLIDATE BY DEED 12305 PRESTON GATEWAY NORTH/ GERARD PROPERTY 4/19/2012 A 5/23/2012 REGIONAL 0 5 1
PROCESS SKIP SKETCH; COMMUNITY MEETINGS 12420 PRIMROSE HILL 6/28/2012 A 9/19/2012 NORTH 8 5 1
SWM WAIVER PROCESS UNDER SWM REGS IN EFFECT PRIOR TO 5/4/09 W00131 PRIMROSE HILL 10/2/2012 A 10/24/2012 NORTH 0 5 1
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12150 PROCOPIO PROPERTY 12/27/2011 A 1/25/2012 SOUTH 0 4 4
PROCESS
ENVIRONMENTAL
WETLANDS & BUFFER DISTURBANCE; PRE-SUBMISSION COMMUNITY MEETING 12182 PROUT/RUTAN PROPERTY 1/25/2012 A 3/14/2012 CRITICAL AREA 0 7 7
PROCESS TIME EXTENSION FOR COMPLETION OF SUBDIVISION 12617 QUARTERFIELD CROSSING, RESUB Lot 1 11/8/2012 A 12/19/2012 SOUTH 0 4 2
PROCESS TIME EXTENSION 12530 RACE ROAD PROPERTY 9/13/2012 A 9/26/2012 REGIONAL 2 4 5
STANDARDS; ENVIRONMENTAL AFFORESTATION & REFORESTATION; STEEP SLOPES; ROAD IMPROVEMENTS 12572A RANDALLS TRUST, LOT 2 - 1161 GOLDFINCH LANE 10/23/2012 A 11/7/2012 SOUTH 0 4 4
SWM WAIVER PROCESS UNDER SWM REGULATIONS IN EFFECT PRIOR TO 5/4/09 W00128 RED OAK CROSSING 5/4/2012 A 5/30/2012 NORTH 38 3 2
Environment Streams and Stream Buffers 10661 Reecewood Estates 9/17/2009 A 6/13/2012 South 21 4 4
Floodplain Disturbance in 100 year FP F09-010 Reecewood Estates 9/16/2009 A 6/13/2012 South 21 4 4
PROCESS TIME EXTENSION FOR COMPLETION OF SUBDIVISION 12615 REECEWOOD ESTATES 11/7/2012 A 12/5/2012 SOUTH 0 4 4
STANDARDS PRIVATE ROAD 12243 REED PROPERTY 3/5/2012 A 5/16/2012 CRITICAL AREA 5 1 7
PROCESS REC AREA REQUIREMENTS 12356 RESERVE AT STONEY CREEK PHASE 2, THE 5/23/2012 A 8/1/2012 NORTH   1 3
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS 12242 RIVIERA BEACH - LOTS 1 7 2 3/2/2012 A 5/2/2012 NORTH 1 3 3
STANDARDS DESIGN MANUAL - PRIVATE ENTRANCES 12368 RIVIERA BEACH LOTS 1 & 2 5/31/2012 A 6/13/2012 NORTH 0 3 3
STANDARDS ROAD IMPVTS 12400 ROBINSON KNOLLS, LOT 38 6/19/2012 A 8/1/2012 NORTH 0 3 5
STANDARDS ROAD IMPVTS 12401 ROBINSON KNOLLS, LOT 39 6/19/2012 A 8/1/2012 NORTH 0 3 5
STANDARDS R/W ROAD FRONTAGE IMPROVEMENTS 12379 ROBYNNS ENCLAVE 6/5/2012 A 8/1/2012 DMA 0 4 2
ENVIRONMENTAL LANDSCAPE MANUAL; FOREST CONSERVATION 12493A ROCK HILL SEC D, SMO, INC - FT SMALLWOOD 10/16/2012 A 12/5/2012 NORTH 0 3 3
PROCESS SKIP SKETCH, PROCEED TO FINAL; SKIP PRELIMNARY PROCEED TO SDP; COMMUNITY MEETING 12127 ROCK HILLS, SEC D, SMO INC - FT SMALLWOOD 12/9/2011 A 2/8/2012 LAA 0 3 3
STANDARDS R-O-W WIDTH AND PAVEMENT WIDTH 12156 ROUND BAY O/T SEVERN, LOTS 19 & 20, BLK A 1/4/2012 A 2/22/2012 NORTH 3 5 0
ENVIRONMENTAL STEEP SLOPES 12444 ROUND BAY PT LOT 383 - 620 OLD COUNTY RD 7/13/2012 A 8/12/2012 CRITICAL AREA 0 3 5
STANDARDS ROAD IMPVTS 12364 ROUND BAY, LOTS 50, 57&58 5/29/2012 A 7/3/2012 CRITICAL AREA 0 3 5
PROCESS SKIP SDP 12497A ROYAL FARMS - 8551 FT. SMALLWOOD RD 11/19/2012 A 11/20/2012 REGIONAL 0 3 3
PROCESS PRELIMINARY PLAN 12412 SABRINA PARK BLK F LOTS 71-81 6/25/2012 A 7/18/2012 NORTH 5 3 5
STANDARDS SEWER EXTENSION 12261A SABRINA PARK, LOTS 14-16 BK I - CLARENCE AVE 5/4/2012 A 5/30/2012 NORTH 0 3 5
STANDARDS DESIGN STANDARDS - PAVEMENT WIDTH 12452 SABRINA PARK, LOTS 67-68 SC K 7/20/2012 A 8/15/2012 NORTH 0 3 5
PROCESS SKIP SDP 12547A SAMS CLUB 10/11/2012 A 10/17/2012 REGIONAL 0 2 6
PROCESS
ENVIRONMENTAL
DISTURBANCE TO NON-TIDAL WETLANDS & BUFFERS; STREAMS & BUFFERS; COMMUNITY MEETING 12478 SAWMILL CREEK PARK 8/10/2012 A 8/22/2012 NORTH 0 2 2
FP FP DISTURBANCE; COMMUNITY MEETING F12-011 SAWMILL CREEK PARK 8/10/2012 A 8/22/2012 NORTH 0 2 2
PROCESS
ENVIRONMENTAL
LOT RATIO; DISTURBANCE TO BUFFER TO NON-TIDAL WETLANDS 12477 SCURRY, LILLIAN PROPERTY, RESERVE PARCEL 8/10/2012 A 10/3/2012 NORTH 1 3 3
STANDARDS ROAD IMPROVEMENTS 12570 SELBY ON THE BAY, LOT 28, BLK A - 3669 FIRST AVE 10/4/2012 A 11/1/2012 CRITICAL AREA 0 1 7
STANDARDS
ENVIRONMENTAL
REC AREA; CONSERVATION AREA; RD IMPROVEMENTS 11800 SEVENTY THREE SIXTY NINE (7369) E. FURNACE BRANCH ROAD 6/14/2011 A 2/1/2012 NORTH 4 5 2
STANDARDS
ENVIRONMENTAL
ROAD FRONTAGE IMPROVEMENTS; REC AREA & OPEN SPACE 12233 SEVERN ACRES, RESUB LOTS 12 & 13 2/27/2012 A 10/24/2012 NORTH 6 3 5
STANDARDS PUBLIC ROAD IMPROVEMENTS 11766 SEVERN ACRES/ST. MARTINS MANOR AT, LOTS 14, 16R, 18 & 19 5/26/2011 A 12/5/2012 NORTH 17 3 5
PROCESS TIME EXTENSION FOR RESUBMITTAL 12649 SEVERN HIGHLANDS - COMMERCIAL LOT 11/30/2012 A 12/17/2012 REGIONAL 0 2 4
STANDARDS R-O-W ROAD IMPROVEMENTS - SHOULDER WIDTH 11725 SEVERN PLACE 4/28/2011 A 7/18/2012 SOUTH 30 4 4
PROCESS SKIP SDP, MEETING 11319R SEVERN RUN EVANGELICAL PRESBYTERIAN 7/25/2012 A 8/12/2012 SOUTH 0 4 4
ENVIRONMENTAL LANDSCAPE 12606 SEVERN SCHOOL RECONSTRUCTION, PHASE 1 11/5/2012 A 12/19/2012 CRITICAL AREA 0 3 5
PROCESS AMENDED PLAT TO REMOVE BRL 12092 SEVERNA FOREST LOT 61, 821 COTTONWOOD DR 11/18/2011 A 1/4/2012 NORTH 3 5 0
PROCESS
ENVIRONMENTAL
NON-TIDAL WETLANDS & BUFFERS; STREAM & BUFFER; STEEP SLOPES; FOREST CON FEE-IN-LIEU; CLEARING BELOW THRESHOLD 12024 SEVERNA PARK ADULT ASSISSTED LIVING 10/12/2011 A 5/16/2012 NORTH 1 3 5
PROCESS TIME EXTENSION FOR RESUBMITTAL 12149 SEVERNA PARK ADULT ASSISTED LIVING 12/27/2011 A 1/25/2012 NORTH 0 3 5
FP FP DISTURBANCE FOR GRADING & DRIVEWAY CROSSING F11-012 SEVERNA PARK ADULT ASSISTED LIVING 9/26/2011 A 5/16/2012 NORTH 0 3 5
PROCESS
STANDARDS
MODIFICATION FEE; ROW ROAD IMPROVEMENTS; FINAL PLAN DIRECT TO PLAT 12488 SEVERNA PARK, 101*-103 RIGGS AVENUE SEC E 8/15/2012 A 10/3/2012 NORTH 0 3 5
PROCESS AMENDED RECORD PLAT 12177 SEVERNA PARK, 101-103 RIGGS AVENUE SEC E 1/19/2012 A 2/29/2012 NORTH 0 3 5
STANDARDS ROAD IMPVTS & SEWER EXT 12304 SEVERNA PARK, LOTS 8&9 4/19/2012 A 5/30/2012 CRITICAL AREA 0 3 5
PROCESS TIME EXTENSION FOR FINAL COMPLETION 12653 SHANNON PARK 12/5/2012 A 12/12/2012 NORTH 0 3 3
STANDARDS ROAD STANDARDS 10845A SHELBOURNE MANOR, LOTS 1-5, AMENDED 10/5/2012 A 10/24/2012 SOUTH 0 3 3
PROCESS
STANDARDS
ENVIRONMENTAL
STEEP SLOPES, ROW ROAD IMPROVEMENTS, COMMUNITY MTG 11972R SHERWOOD FOREST MAINTENANCE FACILITY 11/28/2011 A 1/4/2012 CRITICAL AREA 0 2 6
PROCESS
ENVIRONMENTAL
STEEP SLOPES; COMMUNITY MEETING 12578 SHERWOOD FOREST, LOT 130, PL 1 - 130 FRIAR TUCK HILL 10/10/2012 A 11/1/2012 CRITICAL AREA 0 2 6
PROCESS
STANDARDS
ENVIRONMENTAL
STEEP SLOPES; COMMUNITY MEETING; ROAD IMPROVEMENTS 12543 SHERWOOD FOREST, LOT 206 9/20/2012 A 10/17/2012 CRITICAL AREA 0 2 6
PROCESS
ENVIRONMENTAL
STEEP SLOPES; COMMUNITY MEETING 12526 SHERWOOD FOREST, LOT 647 9/11/2012 A 10/12/2012 CRITICAL AREA 0 2 6
ENVIRONMENTAL, PROCESS STEEP SLOPES AND BUFFER, COMMUNITY MEETING 12126 SHERWOOD FOREST, LOT 731 12/9/2011 A 1/18/2012 CRITICAL AREA 0 2 6
PROCESS TIME EXTENSION FOR RESUBMITTAL 12597 SHIPLEY'S HOMESTEAD 10/25/2012 A 11/15/2012 REGIONAL 0 4 1
STANDARDS ROAD FRONTAGE IMPROVEMENTS 12613 SHORE ACRES, LOT 43 11/5/2012 A 12/5/2012 CRITICAL AREA 0 3 3
PROCESS
STANDARDS
ENVIRONMENTAL
STEEP SLOPE BUFFER DISTURBANCE; R-O-W ROAD FRONTAGE IMPROVEMENTS; COMMUNITY MEETING 12162 SHORELAND LOT 128 PL A 1/6/2012 A 6/13/2012 CRITICAL AREA 5 2 0
SWM PROCESS UNDER SWM REGS IN EFFET PRIO TO 5/4/09 W00130 SMITH PROPERTY 6/6/2012 A 8/1/2012   0 2 6
PROCESS TIME EXTENSION 12207 SNUG HARBOR, PARCEL 841 2/9/2012 A 2/29/2012 CRITICAL AREA 0 7 7
PROCESS SKETCH & COMMUNITY MEETING 12428 SNUG HARBOR, PARCEL 841 7/3/2012 A 9/19/2012 CRITICAL AREA 0 7 7
PROCESS
STANDARDS
ENVIRONMENTAL
WETLAND BUFFER, ROAD IMPROVEMENTS, COMMUNITY MEETING 12103 SOLLEY HEIGHTS, LOT 3A 11/28/2011 A 1/18/2012 NORTH 0 3 3
STANDARDS R-O-W ROAD FRONTAGE IMPROVEMENTS; WETLANDS & WETLAND BUFFER DISTURBANCE 11949A SOLLEY HEIGHTS, LOTS 53-54 11/13/2011 A 2/1/2012 NORTH 3 3 0
STANDARDS
ENVIRONMENTAL
SPECIMEN TREES; ROAD STANDARD DETAILS; WETLANDS & WETLAND BUFFERS 11904 SOLOMONS CHOICE 8/4/2011 A 12/12/2012 JDT 65 3 5
FP DISTURBANCE TO FP F11-011 SOLOMONS CHOICE 8/4/2011 A 12/12/2012 JDT 65 3 5
PROCESS SUBDIVISION PROCESS; PRE-SUBMITTAL MEETING 12521 SOUTHAVEN, BLK D, LOTS 1-5, P/O B 9/6/2012 A 9/19/2012 CRITICAL AREA 0 2 6
PROCESS SDP; COMMUNITY MEETING 12331 SS CONSTANTINE & HELEN GREEK ORTHODOX CHURCH 5/4/2012 A 5/30/2012 NORTH 0 2 6
PROCESS
ENVIRONMENTAL
NON-TIDAL WETLANDS BUFFER; STEEP SLOPES BUFFER; PRE-SUBMITTAL COMMUNITY MEETING 12051A STALK, GEORGE PROPERTY 12/14/2011 A 1/25/2012   0 3 3
PROCESS SKIP SDP 12382 STARBUCKS - WAUGH CHAPEL 6/6/2012 A 6/27/2012   0 4 4
PROCESS
ENVIRONMENTAL
STEEP SLOPES BUFFER; COMMUNITY MEETING 12549 STEEDMAN POINT 9/24/2012 A 10/17/2012 CRITICAL AREA 0 3 3
PROCESS TIME EXTENSION TO COMPLETE SUBDIVISION 12153 STONEGATE FOREST 12/28/2011 A 1/4/2012 SOUTH 11 4 4
PROCESS TIME EXT FOR SUBMITTAL 12217 STONEPOINTE 2/16/2012 A 3/7/2012 SOUTH TEAM 0 4 2
PROCESS TIME EXTENSION 12249 SUMMERFIELD VILLAGE PHASE 1 3/7/2012 A 5/16/2012 SOUTH 126 4 4
PROCESS TIME EXTENSION; MODIFICATION FEE 12589 SUMMERFIELD VILLAGE, PHASE 1 10/23/2012 A 11/15/2012 SOUTH 0 4 4
PROCESS TIME EXTENSION; MODIFICATION FEE 12590 SUMMERFIELD VILLAGE, PHASE 2 10/23/2012 A 11/15/2012 SOUTH 0 4 4
STANDARDS ROAD IMPROVEMENTS 12134 SUNRISE BEACH, LOT 706 SC 5 PL1 12/15/2011 A 1/11/2012   1 2 4
PROCESS SKIP SDP 12262 SWEET TARTS LLC 3/19/2012 A 3/28/2012 SOUTH 0 1 7
PROCESS COMMUNITY  MEETINGS; PRELIMINARY PLAN; SDP; MODIFICATION FEE 12605 SYLVAN SHORES STORMWATER INFRASTRUCTURE 11/2/2012 A 11/28/2012 REGIONAL 0 2 7
ENVIRONMENTAL STEEP SLOPES 11792 SYNYER PROPERTY, THE POD 6/10/2011 A 1/18/2012 CRITICAL AREA 0 3 5
PROCESS DEDICATE ROW WITHOUT PLAT 12557 TANYARD COVE NORTH 1A 10/1/2012 A 10/12/2012 NORTH 0 3 3
PROCESS TIME EXTENSION FOR RESUBMITTAL 12397 TANYARD COVE NORTH SECTION 1B 6/14/2012 A 6/20/2012 NORTH 117 3 3
PROCESS TIME EXTENSION FOR SUBMITTAL 12218 TANYARD COVE NORTH SECTION 1-B 2/16/2012 A 3/7/2012 NORTH 117 3 3
PROCESS TIME EXTENSION FOR RESUBMITTAL 12303 TANYARD COVE NORTH SECTION 1-B 4/19/2012 A 5/16/2012 NORTH 117 3 3
PROCESS TIME EXTENSION 12385 TANYARD COVE NORTH SECTION 1-C 6/16/2012 A 7/11/2012 CRITICAL AREA 0 3 3
PROCESS SKIP SDP 12562 TANYARD COVE, CREEKSIDE VILLAGE AT, SEC 2 10/2/2012 A 10/24/2012 CRITICAL AREA 208 2 3
PROCESS TIME EXTENSION FOR COMPLETION OF SUBDIVISION 12594 TATE, C.G. PROPERTY 10/24/2012 A 11/7/2012 SOUTH 0 4 5
STANDARDS ROW ROAD FRONTAGE IMPROVEMENTS; MODIFICATION FEE 12480 THE CARRIGAN PROPERTY 8/13/2012 A 8/22/2012 NORTH 0 3 5
PROCESS SKIP SDP; SKIP COMMUNITY MEETING 12499 THE MTS BUILDING AT HERRINGTON HARBOUR NORTH 8/22/2012 A 9/19/2012 SOUTH 0 8 7
PROCESS
ENVIRONMENTAL
STEEP SLOPES; REFORESTATION FEE-IN-LIEU; COMMUNITY MEETING 12196 THE RESERVE AT STONEY CREEK 2/2/2012 A 4/18/2012 NORTH 0 1 3
STANDARDS ROAD FRONATAGE IMPROVEMENTS; OS & REC AREA 12047 THOMPSON FARMS, RESUB LOT 16 10/25/2011 A 2/8/2012 SOUTH 4 4 2
PROCESS SKIP SKETCH; SKIP POST-SUBMITTAL COMMUNITY MTG 12390 TUCKER PROPERTY 6/13/2012 A 9/19/2012 SOUTH 5 4 4
SWM WAIVER PROCESS UNDER SWM REGULATIONS IN EFFECT PRIOR TO 5/4/09 W00108 TWO RIVERS PUD 3/28/2011 A 4/25/2012   2065 4 4
ENVIRONMENTAL STEEP SLOPES & BUFFER 12550 TWO RIVERS PUD 9/24/2012 A 10/24/2012 REGIONAL 0 4 2
STANDARDS R/W ROAD FRONTAGE IMPROVEMENTS 12406 TYDINGS ON THE BAY, LOTS 14 & 15 6/21/2012 A 8/1/2012 CRITICAL AREA   3 5
PROCESS SKIP SDP 12348 UNDER ARMOUR 5/18/2012 A 6/13/2012 CRITICAL AREA 0 3 3
PROCESS
STANDARDS
SKIP PRELINARY & SDP; COMMUNITY MEETING; ROAD IMPROVEMENTS 12544 VESTRY OF ST. JAMES' PARRISH 9/20/2012 A 11/7/2012 REGIONAL 0 8 7
FP DISTURBANCE TO FP F11-007R VILLAGE AT STEPHENS WOODS 10/24/2012 A 12/12/2012 NORTH 0 3 5
STANDARDS
ENVIRONMENTAL
ROAD DESIGN; FOREST CONSERVATION; STREAM & BUFFER DIST; STEEP SLOPES; REC AREA; DESIGN MANUAL 12093A VILLAGE AT STEPHENS WOODS 10/24/2012 A 12/12/2012 NORTH 0 3 5
PROCESS SKIP SDP: PRE & POST SUBMISSION COMMUNITY MEETING 12169 VILLAGE OF LEE AIRPORT 1/12/2012 A 1/25/2012 SOUTH 0 1 7
PROCESS SKIP SDP 12432 VILLAGE SOUTH @ WAUGH CHAPEL 7/6/2012 A 7/10/2012 SOUTH 0 2 4
PROCESS TIME EXTENSION FOR SUBDIVISION 12419 VILLAGGIO ENCLAVE 6/27/2012 A 8/1/2012 NORTH 92 3 2
PROCESS TIME EXTENSION TO COMPLETE SUBDIVISION 12152 VILLAGIO ENCLAVE 12/28/2011 A 1/18/2012 NORTH 92 3 2
PROCESS TIME EXTENSION FOR APF, FINAL PLAN & SDP 12151 WALGREEN'S, STORE #12559 12/28/2011 A 1/18/2012 REGIONAL 0 4 4
PROCESS
ENVIRONMENTAL
STEEP SLOPES & BUFFERS; CMTY MTG; FEES & SECURITIES 10571R WATERBURY HEIGHTS LOT 39 PL 1 2/22/2012 A 3/14/2012 CRITICAL AREA 0 2 4
ENVIRONMENTAL FOREST CONSERVATION THRESHOLD 12160 WATTS PROPERTY 1/5/2012 A 11/7/2012 SOUTH 4 2 9
STANDARDS ROAD FRONTAGE IMPROVEMENTS 12641 WEST SHOREHAM, LOT 17 1200 CEDAR LANE, EDGEWATER 11/21/2012 A 12/12/2012 CRITICAL AREA 0 1 7
PROCESS SKIP SDP 12339 WESTFIELD ANNAPOLIS 5/9/2012 A 6/13/2012 SOUTH 0 2 6
STANDARDS ROAD IMPROVEMENTS 12595 WHITEHALL BEACH, LOT 50, PL 1 - 712 BLACK FOREST ROAD 10/24/2012 A 11/20/2012 CRITICAL AREA 0 3 5
PROCESS SKIP SDP 10424R WILD WILLIES @ ANNAPOLIS TOWNE CENTRE 9/19/2011 A 3/7/2012 REGIONAL 0 2 6
STANDARDS
ENVIRONMENTAL
REC AREA; ROADWAY DETAILS; 25' WETLAND BUFFER DISTURBANCE; STREET TREES 10815A WILDE, FRANK F. SUBDIVISION - TRACT 3 5/31/2011 A 2/29/2012 CRITICAL AREA 5 7 7
PROCESS TIME EXTENSION FOR RESUBMITTAL 12263 WILLIS, JUSTIN PROPERTY 3/20/2012 A 4/18/2012 NORTH 0 3 5
ENVIRONMENTAL SPECIMEN TREES 9050AR WILSON'S GROVE 11/1/2012 A 12/5/2012 NORTH 0 3 2
ENVIRONMENTAL STEEP SLOPES 12269R WIMBLEDON FARMS, LOT 15 6/28/2012 A 8/1/2012 CRITICAL AREA 0 3 6
PROCESS TIME EXTENSION FOR SDP 12545 WINMARK CENER P1132/187 ODENTON HEALTH & TECHNOLOGY CAMPUS 9/21/2012 A 9/26/2012 REGIONAL 0 4 4
STANDARDS ROAD IMPROVEMENTS 12470 WOODLAND BEACH, LTS 3515-3518 8/7/2012 A 9/5/2012 SOUTH 0 1 7
ENVIRONMENTAL STEEP SLOPES 12054 WYATTS HILLS, LOTS 6 & 7 (AMENDED PLAT) 10/31/2011 A 1/18/2012 SOUTH 0 2 6