Image: Banner Displaying Anne Arundel County Seal and Maryland State Flag

Button: Print this Page
Search

Button: About Anne Arundel County Government

Button: Doing Business with/in Anne Arundel County

Button: Information for Anne Arundel County Residents

Button: View/Pay AACo. Bills Using Munis-Online

Button: View Current Anne Arundel County Job Openings

Button: Back to HomePage

|

Button: Site Map

|

Button: Contact Us

button: Go back to the DPW Home Page
button: Customer Relations

Button: DPW TV

button: Utilities

Image: Waste Management Button

button: Bureau of Engineering

button: Bureau of Highways

button: Contact DPW

You are here:Home > Department of Public Works > Utilities > Petition Process

Petition Process - Public Water and/or Wastewater Service

   
To obtain public water and/or wastewater service, a majority (51%) of property owners must petition for the requested service. The petition area is defined as the area from the existing service to the proposed final property to receive service.

>> Water and/or Wastewater Petition Form Icon: PDF

Petitions are to be submitted to:

Department of Public Works
Financial Services Division
2662 Riva Road, MS-7408
Annapolis MD 21401

Once received, the petition will be reviewed for validation. (Please remember, if two people are listed as property owners, both owners must sign and date the petition and that the signatures must also be witnessed).

After the petition is validated, a preliminary study will be conducted to determine the feasibility of providing the service and to develop a cost analysis to assure the project will be self-supporting by the property owners. A public meeting will be held with the community to discuss the project.

Water and wastewater petition projects are paid for by the property owner through a Front Foot Benefit Assessment. This assessment is placed on the property for a period of thirty (30) years and transfers with the property if it is sold. To calculate an assessment, we add the front (abutting) property dimension to the rear dimension and divide this total by two. (For commercial property, the average width is then multiplied by three, industrial property by five.)  This average width is then multiplied by a rate calculated from total construction and financing costs.

image: quick links

>>Utilities Home Page

>>Billing Services
>>Bureau of Utilities

>>

Comparison Chart
>>Drip Calculator
>>Emergency Services
>>Grinder Pumps
>>Household Water Waste
>>Meter Services Division
>>Meter Services FAQs
>> Obtaining Water and Wastewater Services
>>Phone Numbers
>>Pretreatment
>>Rainwater Harvesting
>>Septic Tanks
>>Sewer Backups

>>

Sewer Line
>>Sewer Cleanout Diagram
>>Sewer Services
>>Sewer Surcharge Worksheet
>>Sewer Surcharge FAQs
>>Toilet Leaks
>>Water and Sewer Service
>>Water Conservation
>>Water Distribution System
>>Water Leaks
>>Water Lines
>>Water Quality Reports

>>

Water Quality Pressure
>>Water Quality Report Archives
>>Water Saver
>>Water Saving Tips
>>Xeriscaping

  

For a typical residential property, the current connection charges for water are $6,600, and the current connection charges for wastewater are $10,400. These rates are subject to change. We do offer improved properties payment options for the connection charges.

Should you need any assistance in completing a petition, please do not hesitate to contact the Financial Services Division at (410) 222-7517.

                                                                   

   

image: county website footer

button: website suggestions

button: website disclaimer